HORIZON
Share

Shivshakti Nagar CHS C and D Wing

P51800028325 · MahaRERA · https://gethorizon.in/projects/shivshakti-nagar-chs-c-and-d-wing-borivali-uj3oec6f

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
Shivshakti Nagar CHS C and D Wing
Units
30 units
Mix
29 × 1 BHK · 1 × Shop
Carpet area
28–31 sq mper-unit range, as filed
Floors
24
Buildings
2
Land area
144 sq m
Sanctioned built-up
1,001 sq m

Timeline

RERA registeredFeb 2021
Proposed completionJul 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

30 units across 2 batches
TypeArea sq mCount
Shop281
1 BHK3129

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Bombay Slum Redevelopment Corporation Pvt. Ltd.

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
3Projects
1City
2017–2024Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
154 homeson the public record across 3 projects
11,491 sq mbuilt-up filed
2,562 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Bombay Slum Redevelopment Corporation Pvt. Ltd.— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Borivali
Taluka
Borivali
District
Mumbai Suburban
Pincode
400067
Survey no.
1110 Part
North boundary
DP Road
East boundary
Part of Building no 3
South boundary
Part of Building no 3
West boundary
Part of Building no 3
What’s nearby
SchoolsNearest school 1.3km away · College or university 599m away
HealthcareHospital 377m away · 9 clinics within 1km · Pharmacy within 500m
LifestylePark 1.1km away · Gym or sports centre 1.3km away · 9 restaurants and cafes within 1km
ShoppingSupermarket 855m away · Mall 1.7km away · Bank 423m away
Getting around
Expressway 1.6 km · Western Express HighwayPrimary road 261 m · Swami Vivekanand RoadRailway line 472 m · Western Railway Virar to BorivaliRailway station 563m away (Kandivali)Bus stop within 500m
Water & environment
Water body 787 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,925 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,209 projects the radar draws within 6 km — every kind, every stage — 746 are residential projects still under way. This list keeps only those, and looks further out.

38 projects within 1 km — showing the nearest 6.

KandivaliOthers

EDMONT - AURELIA

Sheth Homes Private Limited

Nov 2023registered
Aug 2029target completion
1 open complaintGovernment Guidance Rate₹1,31,983/sq ydScale378 flatsAuthorityMahaRERA
BorivaliResidential / Group Housing

SHREEJI SKY RISE TOWER

Shreeji Construction

Dec 2021registered
Dec 2026target completion
Scale237 flatsAuthorityMahaRERA
PoisarResidential / Group Housing

MODERN ROOP-KAMAL CO-OPERATIVE HOUSING SOCIETY LTD

Konark Structural Engineers Private Limited

Oct 2025registered
Dec 2029target completion
Government Guidance Rate₹1,11,397/sq ydScale66 flatsAuthorityMahaRERA
PoisarResidential / Group Housing

Swastik House - C Wing

SWASTIK CONSTRUCTIONS

Aug 2024registered
Mar 2030target completion
Government Guidance Rate₹1,34,123/sq ydScale28 flatsAuthorityMahaRERA
KandivaliMixed

PALKHI SAMAYA

PALKHI REALTY LLP

Jun 2026registered
Dec 2032target completion
Government Guidance Rate₹1,29,215/sq ydScale125 flatsAuthorityMahaRERA
MaladResidential / Group Housing

NEW KANDIVALI CHSL

KAMPA PROJECTS LLP

Aug 2024registered
Dec 2026target completion
Scale31 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.