LILLERIA 419
LILLERIA BUILDCON · Vadodara
SIDDHARTH ANNEXE 4
Timeline
38% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
₹42.00 Cr declared to build 115 flats. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
What this number is — and isn’t
The promised possession date (31 Dec 2018) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
1 of 3 blocks carry a Building-Use (BU) permission (latest 30 Oct 2017)— Gujarat’s legal-to-occupy sign-off. The remaining blocks are not shown as BU-cleared here; treat those as not-yet-occupiable until confirmed.
Has approved 655 RERA projects — 3.8% of Gujarat.
an apartments market — 98% apartments · 2% plotted layouts. Apartments like yours are this body's core business.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
1 complaint
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
| Number | Date | |
|---|---|---|
| CMP/Vadodara/210816/000232 | 16 Aug 2021 |
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
81 commercial projects still under way within 25 km. Step out ring by ring:
Of the 676 projects the radar draws within 6 km — every kind, every stage — 23 are commercial projects still under way. This list keeps only those, and looks further out.
2 projects within 1 km — showing the nearest 2.
LILLERIA BUILDCON · Vadodara
VALAS BUILDCON · Vadodara
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you