Dwarka Greens
DWARKADHISH BUILDSPACE LLP · Anand
Surya Villaza
Timeline
89% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
More from CHIRAG HARMANBHAI PATEL Propritor of CHIRAG CONSTRUCTION— the full portfolio →
₹10.43 Cr declared to build 34 flats. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
This filing declares ₹19,475 per sq m of carpet area — 1.62× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The promised possession date (31 Mar 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
All 2 blocks carry a Building-Use (BU) permission (latest 6 Jun 2025)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
The body that approved this project. It has approved 2,653 RERA projects across 26 talukas — about 1 in 6 in Gujarat.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
1 complaint
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
| Number | Date | |
|---|---|---|
| SMC/NCQER/ONLINE/Anand/23072025/00406 | 2 Jul 2025 |
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
105 residential projects still under way within 25 km. Step out ring by ring:
Of the 242 projects the radar draws within 6 km — every kind, every stage — 71 are residential projects still under way. This list keeps only those, and looks further out.
32 projects between 1 and 3 km — showing the nearest 6.
DWARKADHISH BUILDSPACE LLP · Anand
NISHITNATHABHAIPATEL · Anand
OMKAR REALTY · Anand
VRUNDAVAN DEVELOPERS · Anand
ATMIYA EMPIRE ASSOCIATES · Anand
HARSHVADANPRAVINBHAIPATEL · Anand
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you