HORIZON
Share

TRINITY VISTA BUILDING NO 3

PR1240002601523 · MahaRERA · https://gethorizon.in/projects/trinity-vista-building-no-3-kapase-palghar-xgpi4eh1

01

Complete project overview

MahaRERA · Registration filing
Units
39 units
Floors
7
Buildings
2
Parking
14 spaces
Land area
1,730 sq m
Sanctioned built-up
1,730 sq m

Timeline

RERA registeredAug 2026
Proposed completionDec 2031
TodaySep 2026
Construction progress
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Street Lighting0%
Water conservation…0%
Electrical meter r…0%
Superstructure15%
Excavation100%
Plinth100%
Stilt floor100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

TRINITY CONCRETE STRUCTURES PRIVATE LIMITED

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
2Projects
1City
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
57 homeson the public record across 2 projects
2,434 sq mbuilt-up filed
2,141 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from TRINITY CONCRETE STRUCTURES PRIVATE LIMITED— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Kapase
Taluka
Palghar
District
Palghar
Pincode
401102
Survey no.
84/PT
North boundary
BUILDING NO 6
East boundary
9.00 METER INTERNAL ROAD
South boundary
BUILDING NO 2
West boundary
OPEN SPACE
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 547m away
LifestylePark 1.9km away
ShoppingNo supermarket within 2km
Getting around
Primary road 403 mRailway line 1.1 kmRailway station 1.3km away (Saphale)Limited bus connectivity nearby
Water & environment
Water body 2.0 kmRiver 3.5 km · Vaitarna
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹27,258per sq yd
₹32,600per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Kapase”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Collector Office Palghar

Collector office
Building Permit
Survey no. 84/PT
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Collector Office Palghar

Planning authority

Has approved 107 RERA projects0.5% of Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
88
On record
644 flats · 12 plots
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

887 residential projects still under way within 25 km. Step out ring by ring:

Of the 114 projects the radar draws within 6 km — every kind, every stage — 54 are residential projects still under way. This list keeps only those, and looks further out.

10 projects within 1 km — showing the nearest 6.

420 m awayResidential / Group Housing

STAR SIGNATURE CITY - STAR PEARL

STAR BUILDERS & DEVELOPERS · Makane · Palghar

Oct 2021registered
Dec 2026target completion
Government Guidance Rate₹32,275/sq ydScale28 flatsAuthorityMahaRERA
550 m awayResidential / Group Housing

ANGEL APARTMENT

SHREENATHJI ENTERPRISES · Makane · Palghar

Aug 2026registered
Dec 2029target completion
Government Guidance Rate₹32,275/sq ydScale22 flatsAuthorityMahaRERA
570 m awayOthers

MEGASTONE VEDANTA

CHETAN SHANTARAM PATIL · Umberpada · Palghar

Oct 2024registered
Dec 2027target completion
Government Guidance Rate₹30,937/sq ydScale38 flatsAuthorityMahaRERA
640 m awayResidential / Group Housing

PARIVAR ASHISH GALAXY

PARIVAR ASHISH DEVELOPERS · Saphale · Palghar

Mar 2026registered
Jun 2029target completion
Government Guidance Rate₹32,275/sq ydScale81 flatsAuthorityMahaRERA
720 m awayResidential / Group Housing

RIDDHI SIDDHI APARTMENT

RIDDHI SIDDHI APARTMENT · Kardal · Palghar

Jun 2025registered
Dec 2027target completion
Government Guidance Rate₹32,275/sq ydScale13 flatsAuthorityMahaRERA
720 m awayMixed

OM SANKULAN

AMBINEON INFRA LLP · Makane · Palghar

Apr 2026registered
Dec 2030target completion
Government Guidance Rate₹32,275/sq ydScale104 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.