HORIZON
Share

Turning Point

P51800034497 · MahaRERA · https://gethorizon.in/projects/turning-point-andheri-u6d1xblt

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
17 units
Floors
11
Buildings
2
Parking
17 spaces
Land area
453 sq m
Sanctioned built-up
1,158 sq m

Timeline

RERA registeredApr 2022
Proposed completionMar 2025
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

Laxmi Apartment Co Op HSG Society Ltd

SocietyPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2022–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400093
Survey no.
CTS No. 109, 109/1 and 2
North boundary
Adj Cts No -110 and Cts No - 111
East boundary
Adj CTS No -108
South boundary
9 M wide existing Charat Singh Colony Road
West boundary
9 M wide existing Charat Singh Colony Road
What’s nearby
Schools6 schools within 1km · 7 educational institutions within 1km · Library 1.3km away
HealthcareHospital 699m away · 4 clinics within 1km · Pharmacy within 500m
LifestylePark 523m away · Gym or sports centre 635m away · 26+ restaurants and cafes within 1km
ShoppingSupermarket 914m away · Convenience store within 500m · Bank 282m away
Getting around
Expressway 1.4 km · Andheri FlyoverPrimary road 481 m · Sahar Road UnderpassRailway line 1.4 kmMetro station 517m away (Airport Colony Station)2 bus stops within 500m
Water & environment
Water body 1.5 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation
Building Permit
Survey no. CTS No. 109, 109/1 and 2

The promised possession date (31 Mar 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,903 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,591 projects the radar draws within 6 km — every kind, every stage — 891 are residential projects still under way. This list keeps only those, and looks further out.

26 projects within 1 km — showing the nearest 6.

180 m awayResidential / Group Housing

Rakshi-Elanza

OM SAI BUILDERS & DEVELOPERS · Andheri

Dec 2019registered
Mar 2027target completion
Scale154 flatsAuthorityMahaRERA
210 m awayOthers

GALAXY MUNICIPAL TEACHERS CO-OPERATIVE HOUSING SOCIETY LIMITED

AJJU REAL ESTATE AND CONSULTANTS · Kondivita · Andheri

Jan 2026registered
Jun 2028target completion
Government Guidance Rate₹1,66,356/sq ydScale34 flatsAuthorityMahaRERA
250 m awayMixed

AVIARA

BALUWALA BUILDERS · Sahar · Andheri

Aug 2025registered
Dec 2031target completion
Government Guidance Rate₹1,42,033/sq ydScale268 flatsAuthorityMahaRERA
340 m awayResidential / Group Housing

NEW KONKAN CHSL

NEW KONKAN CHSL · Sahar · Andheri

May 2025registered
Dec 2027target completion
Government Guidance Rate₹1,42,033/sq ydScale44 flatsAuthorityMahaRERA
370 m awayMixed

Shiv Aashray

Shiva Rameehans Constructions LLP · Chakala · Andheri

Apr 2026registered
Jan 2028target completion
Government Guidance Rate₹1,58,572/sq ydScale31 flatsAuthorityMahaRERA
400 m awayResidential / Group Housing

KRISHNA RESIDENCES PHASE 1

Krishna Developers Pvt. Ltd · Andheri

Aug 2017registered
Dec 2026target completion
1 open complaintScale157 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.