HORIZON
Share

Magnolia Cluster 1

P52000021143 · MahaRERA · https://gethorizon.in/projects/magnolia-cluster-1-wardoli-panvel-svxan6oj

01

Complete project overview

MahaRERA · Registration filing
Floors
3
Buildings
120
Parking
48 spaces
Land area
10,527 sq m
Sanctioned built-up
7,231 sq m
Recreational open space
957 sq m

Timeline

RERA registeredJun 2019
Proposed completionDec 2026
TodaySep 2026
Construction progress
Podiums0%
Stilt floor0%
Community Building…0%
Energy managemcnt0%
Fire protection an…0%
Open Parking0%
Street Lighting50%
Landscaping & Tree…75%
Internal Roads & F…80%
Water conservation…80%
Water Supply95%
Sewerage (Chamber,…95%
Storm Water Drains95%
Excavation100%
Basement (if any)100%
Plinth100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
OC-readiness100%
Treatment And Disp…100%
Solid Waste Manage…100%
Electrical meter r…100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Wadhwa Construction and Infrastructure Private Limited

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
28Projects
1City
2018–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
3,318 homes · 509 plotson the public record across 28 projects
2,57,652 sq mbuilt-up filed
1,63,402 sq mplotted area
2,17,129 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Wadhwa Construction and Infrastructure Private Limited— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Wardoli
Taluka
Panvel
District
Raigarh
Pincode
410206
Survey no.
RZ-04- Part
North boundary
Cluster 2
East boundary
Plot no CZ-06
South boundary
Town level play ground TL-PG-1
West boundary
Plot boundry
What’s nearby
SchoolsNo schools within 2km
HealthcareNo hospital within 5km
LifestyleNo parks within 2km
ShoppingSupermarket 112m away
Getting around
Expressway 2.6 kmPrimary road 4.6 kmRailway line 1.6 km · Panvel Junction - Karjat JunctionRailway station 2.4km away (Mohope)Limited bus connectivity nearby
Water & environment
Water body 405 mRiver 3.4 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹26,505per sq yd
₹31,700per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Wardoli”.
In force
2026-2027 schedule
Spread
₹23,830₹28,177 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

City and Industrial Development Corporation (CIDCO)

Development Authority
Building Permit
Survey no. RZ-04- Part
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

City and Industrial Development Corporation (CIDCO)

Metropolitan / development authority

Has approved 885 RERA projectsabout 1 in 23 in Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
724
On record
7,061 flats · 987 plots
Reach
5 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

1,672 residential projects still under way within 25 km. Step out ring by ring:

Of the 148 projects the radar draws within 6 km — every kind, every stage — 80 are residential projects still under way. This list keeps only those, and looks further out.

19 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

Wise City RZ8 Wing A2

Wadhwa Construction and infrastructure Private Limited · Wardoli · Panvel

Nov 2023registered
Dec 2029target completion
Government Guidance Rate₹26,505/sq ydScale253 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

Wise City RZ8 Wing D5

Wadhwa Construction and infrastructure Private Limited · Wardoli · Panvel

Sep 2025registered
Dec 2030target completion
Government Guidance Rate₹26,505/sq ydScale103 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

Wise City RZ8 Wing E2

Wadhwa Construction and infrastructure Private Limited · Wardoli · Panvel

Jun 2023registered
Dec 2029target completion
Government Guidance Rate₹26,505/sq ydScale111 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

Wise City, South Block Phase I, Plot RZ8, Building 3 Wing C3

Wadhwa Construction and Infrastructure Private Limited · Wardoli · Panvel

May 2019registered
Dec 2026target completion
1 open complaintGovernment Guidance Rate₹26,505/sq ydScale201 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

Wise City, South Block, Phase I,Plot RZ8 Building 4 Wing F2

Wadhwa Construction and Infrastructure Private Limited · Wardoli · Panvel

May 2019registered
Dec 2026target completion
Government Guidance Rate₹26,505/sq ydScale197 flatsAuthorityMahaRERA
40 m awayResidential / Group Housing

Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A1

Wadhwa Construction and Infrastructure Private Limited · Wardoli · Panvel

Apr 2018registered
Dec 2026target completion
2 open complaintsGovernment Guidance Rate₹26,505/sq ydScale253 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.