Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.
Find your flat
Filed by floor and type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
10 of 10 available
BuildingFloorTypeArea sq mAvailable
RUBY RESIDENCY13BHKmortgaged1082 of 2
RUBY RESIDENCY23BHKmortgaged1082 of 2
RUBY RESIDENCY33BHKmortgaged1082 of 2
RUBY RESIDENCY43BHKmortgaged1082 of 2
RUBY RESIDENCY53BHK1082 of 2
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the builder that any specific flat is released before relying on clear title.
626 homes · 364 plotson the public record across 28 projects
55,198 sq mbuilt-up filed
1,18,324 sq mplotted area
1,41,435 sq mland declared
₹45.83 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Hyderabad Metropolitan Development Authority (HMDA)Urban Development Authoritythis project8 of 25 projects
Greater Hyderabad Municipal Corporation (GHMC)Municipal / Corporation5 of 25 projects
Commissioner, ULBMunicipal / Corporation3 of 25 projects
Commissioner, APCRDAMunicipal / Corporation2 of 25 projects
Directorate of Town & Country Planning (DTCP)Town & Country Planning (DTCP)2 of 25 projects
Belagavi Urban Development AuthorityUrban Development Authority1 of 25 projects
Hubballi Dharwad Municipal CorporationMunicipal / Corporation1 of 25 projects
Kalburgi Urban Development AuthorityUrban Development Authority1 of 25 projects
Karwar Urban Development AuthorityUrban Development Authority1 of 25 projects
Poona Municipal CorporationMunicipal Corporation1 of 25 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 1.9km away · 2 clinics within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 969m away · Bank 700m away
Getting around
Expressway 879 m · Chavella roadPrimary road 2.5 km · Rajendra nagar roadNo metro or railway within 5kmBus stop within 1km
Water & environment
Water body 311 m · local rain water pond
distances only — not a flood assessment
Declared external development
Roads0%
Water supply0%
Sewerage (Chamber,…0%
Rainwater0%
Green Strip/TOT LO…0%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Rainwater0%
Renewable energy0%
Fire safety0%
Electricity0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Location — done
04
Government Guidance Rate
Telangana Registration & Stamps
In Telangana it’s called the market value — the registration department's figure, not a sale price.
₹17,900per sq yd
₹21,408per sq m
₹3,000per sq ft for a flat · same schedule
Which rate
residential (urban)
Matched to
The middle village rate across 15 villages of “RAJENDRANAGAR” mandal — the mandal, not this village.
In force
effective May 2026
What this number is — and isn’t
The minimum value Telangana’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of mandal, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Telangana · Approved building plan
Hyderabad Metropolitan Development Authority (HMDA)
The promised possession date (10 May 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
HMDA
Urban Development Authority · Hyderabad metropolitan periphery
Has approved 3,643 RERA projects — about 1 in 3 in Telangana.
an apartments market — 72% apartments · 28% plotted layouts. Apartments like yours are this body's core business.
Builders
2,462
On record
3,98,695 flats · 1,96,015 plots
Reach
71 mandals
Since
2016
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Telangana doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Telangana
Litigation
None declared in this filing
Only what the builder declared, or what RERA Telangana records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Telangana, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,459 residential projects still under way within 25 km. Step out ring by ring:
Of the 567 projects the radar draws within 6 km — every kind, every stage — 269 are residential projects still under way. This list keeps only those, and looks further out.
17 projects within 1 km — showing the nearest 6.
710 m awayResidential
BRICKCEM ARCKADIA
BRICKCEM CONSTRUCTION PRIVATE LIMITED · KISMATHPUR · Gandipet
3 yr
Mar 2025registered
Mar 2028target completion
Government Guidance Rate₹13,600/sq ydScale20 flatsAuthorityRERA Telangana