The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Borivali
Taluka
Borivali
District
Mumbai Suburban
Pincode
400064
Survey no.
385 pt.
North boundary
Sunder Lane
East boundary
Jan Vikas CHS CTS No 383E
South boundary
CTS No 382A
West boundary
La Link CHS CTS No 307 17
What’s nearby
Schools1 school within 500m · 4 educational institutions within 1km · College or university 1.2km away
HealthcareHospital 174m away · 6 clinics within 1km · Doctor's clinic within 1km
Lifestyle1 park within 500m · Gym or sports centre 306m away · 8 restaurants and cafes within 1km
ShoppingSupermarket 845m away · Mall 235m away · Convenience store within 500m
Getting around
Expressway 2.3 km · Times of India FlyoverPrimary road 316 m · Link RoadRailway line 1.4 km · Western Railway Virar to BorivaliMetro station 442m away (Valnai-Meeth Chowky)Limited bus connectivity nearby
Water & environment
Water body 707 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Slum Rehabilation Authority
Building Permit
Survey no. 385 pt.
The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Slum Rehabilation Authority
Planning authority
Has approved 41 RERA projects — 0.2% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
36
On record
365 flats · 0 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,739 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,134 projects the radar draws within 6 km — every kind, every stage — 721 are residential projects still under way. This list keeps only those, and looks further out.
66 projects within 1 km — showing the nearest 6.
ValnaiOthers
SHREEJI NAKSHTRA
SHREEJI CONSTRUCTION
3 yr 6 mo
Feb 2025registered
Aug 2028target completion
⚠ 1 open complaintGovernment Guidance Rate₹1,52,568/sq ydScale215 flatsAuthorityMahaRERA