Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
14 units across 7 batches
TypeArea sq mCount
2 BHK541
2 BHK525
1 BHK394
Shop331
Shop201
Shop181
Shop211
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools1 school within 500m · 4 educational institutions within 1km · College or university 1.2km away
HealthcareHospital 153m away · 6 clinics within 1km · Doctor's clinic within 1km
Lifestyle2 parks within 500m · Gym or sports centre 315m away · 8 restaurants and cafes within 1km
ShoppingSupermarket 875m away · Mall 204m away · Convenience store within 500m
Getting around
Expressway 2.3 km · Times Of India FlyoverPrimary road 331 m · Link RoadRailway line 1.4 km · Western Railway Virar to BorivaliMetro station 439m away (Valnai-Meeth Chowky)Limited bus connectivity nearby
Water & environment
Water body 729 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
3,745 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,136 projects the radar draws within 6 km — every kind, every stage — 721 are residential projects still under way. This list keeps only those, and looks further out.
64 projects within 1 km — showing the nearest 6.
ValnaiOthers
SHREEJI NAKSHTRA
SHREEJI CONSTRUCTION
3 yr 6 mo
Feb 2025registered
Aug 2028target completion
⚠ 1 open complaintGovernment Guidance Rate₹1,52,568/sq ydScale215 flatsAuthorityMahaRERA