HORIZON
Share

Triton Building No 3 Wing C

P51800031135 · MahaRERA · https://gethorizon.in/projects/triton-building-no-3-wing-c-borivali-8lpihgn4

Registration de-registered

MahaRERA has de-registered this project — the registration was cancelled. This is a serious signal: the project is no longer under active RERA registration. Do not transact without independent legal verification of what happened and where the project stands.

01

Complete project overview

MahaRERA · Registration filing
Units
146 units
Mix
146 × 3 BHK
Carpet area
85–91 sq mper-unit range, as filed
Floors
46
Parking
1 spaces
Land area
3,595 sq m
Sanctioned built-up
14,255 sq m
Recreational open space
1,027 sq m

Timeline

RERA registeredOct 2021
Proposed completionDec 2026
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

146 units across 2 batches
TypeArea sq mCount
3 BHK91129
3 BHK8517

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

S D Corporation Private Limited

CompanyPromoter type
Mumbai City, MAHARASHTRABased in
15Projects
3Cities
2019–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
1,575 homeson the public record across 15 projects
1,44,327 sq mbuilt-up filed
5,64,140 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Maharashtra Housing and Area Development Authority (MHADA)Housing Authority8 of 13 projects
Maharashtra Housing Area Development AuthorityDevelopment Authority2 of 13 projects
Slum Rehabilitation AuthoritySlum Rehabilitation Authority2 of 13 projects
Maharashtra Housing And Development Corporation Limited1 of 13 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from S D Corporation Private Limited— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Borivali
Taluka
Borivali
District
Mumbai Suburban
Pincode
400101
Survey no.
840 A/1 part
North boundary
Internal Access Road
East boundary
Building No 3 Wing B Astron
South boundary
Mahindra and Mahindra
West boundary
Mahindra and Mahindra
What’s nearby
Schools1 school within 1km
HealthcareHospital 102m away · 3 clinics within 1km · Pharmacy within 1km
LifestylePark 509m away · Playground within 500m · Gym or sports centre 899m away
ShoppingSupermarket 427m away · Mall 388m away · Convenience store within 500m
Getting around
Expressway 262 m · Western Express HighwayPrimary road 1.6 kmRailway line 749 m · FCIMetro station 382m away (Magathane)Bus stop within 1km
Water & environment
River 1.1 km · Dahisar RiverWater body 2.5 km · Veer Savarkar Udyan Pond
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

4,195 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,943 projects the radar draws within 6 km — every kind, every stage — 687 are residential projects still under way. This list keeps only those, and looks further out.

17 projects within 1 km — showing the nearest 6.

BorivaliResidential / Group Housing

Building no 3 Wing C Aquila

S D CORPORATION PRIVATE LIMITED

Jan 2022registered
Dec 2026target completion
1 open complaintScale146 flatsAuthorityMahaRERA
PoisarResidential / Group Housing

VICEROY PRIVE

SIMBA PROPERTIES LLP

Feb 2023registered
Dec 2027target completion
Government Guidance Rate₹1,61,950/sq ydScale61 flatsAuthorityMahaRERA
MagathaneOthers

The Grand Residences

MATRUBHUMI CONSTRUCTION PRIVATE LTD

Oct 2023registered
Dec 2027target completion
Government Guidance Rate₹1,43,839/sq ydScale104 flatsAuthorityMahaRERA
MagathaneResidential / Group Housing

Rivali Park - Skyleap

CCI PROJECTS PRIVATE LIMITED

Nov 2025registered
Jul 2032target completion
Scale178 flatsAuthorityMahaRERA
MagathaneResidential / Group Housing

Rivali Park - Stargaze

CCI PROJECTS PRIVATE LIMITED

Nov 2023registered
Oct 2029target completion
Scale198 flatsAuthorityMahaRERA
MagathaneResidential / Group Housing

Rivali Park - Moonrise

CCI PROJECTS PRIVATE LIMITED

Apr 2024registered
Jun 2030target completion
Scale354 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.