Construction of 412 Housese in Hebbala
Karnataka Slum Development Board · Bengaluru North
VAISHNAVI NORTH 24
Timeline
Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes. Exclusive area is the common area allotted exclusively to the unit's owner, as the register names it. Undivided share is the portion of the land that comes with the unit, as filed — a share of the whole plot, not a demarcated piece of ground.
| Unit | Type | Carpet | Exclusive area | Undivided share | Unit | Type | Carpet | Exclusive area | Undivided share |
|---|---|---|---|---|---|---|---|---|---|
| A 001Ground Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A 002Ground Floor · A | 3BHK | 104.83 | 6.64 | 55.76 |
| A 003Ground Floor · A | 3BHK | 104.83 | 6.64 | 58.25 | A 004Ground Floor · A | 3BHK | 104.83 | 6.64 | 58.62 |
| A 005Ground Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A 006Ground Floor · A | 3BHK | 104.83 | 6.64 | 55.76 |
| A 007Ground Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A 008Ground Floor · A | 3BHK | 106.90 | 6.64 | 55.76 |
| A 009Ground Floor · A | 2BHK | 76.48 | 5.54 | 40.77 | A 010Ground Floor · A | 3BHK | 106.90 | 6.64 | 55.76 |
| A 011Ground Floor · A | 3BHK | 106.90 | 6.64 | 58.86 | A 012Ground Floor · A | 3BHK | 106.90 | 6.64 | 55.76 |
| A 013Ground Floor · A | 3BHK | 106.90 | 6.64 | 55.76 | A 014Ground Floor · A | 2BHK | 76.48 | 5.54 | 40.77 |
| A1011st Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A1021st Floor · A | 3BHK | 104.83 | 6.64 | 55.76 |
| A1031st Floor · A | 3BHK | 104.83 | 6.64 | 58.25 | A1041st Floor · A | 3BHK | 104.83 | 6.64 | 58.62 |
| A1051st Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A1061st Floor · A | 3BHK | 104.83 | 6.64 | 55.76 |
| A1071st Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A1081st Floor · A | 3BHK | 106.90 | 6.64 | 55.76 |
| A1091st Floor · A | 2BHK | 76.48 | 5.54 | 40.77 | A1101st Floor · A | 3BHK | 106.90 | 6.64 | 55.76 |
| A1111st Floor · A | 3BHK | 106.90 | 6.64 | 58.86 | A1121st Floor · A | 3BHK | 106.90 | 6.64 | 55.76 |
| A1131st Floor · A | 3BHK | 106.90 | 6.64 | 55.76 | A1141st Floor · A | 2BHK | 76.48 | 5.54 | 40.77 |
| A2012nd Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A2022nd Floor · A | 3BHK | 104.83 | 6.64 | 55.76 |
| A2032nd Floor · A | 3BHK | 104.83 | 6.64 | 58.25 | A2042nd Floor · A | 3BHK | 104.83 | 6.64 | 58.62 |
| A2052nd Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A2062nd Floor · A | 3BHK | 104.83 | 6.64 | 55.76 |
| A2072nd Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A2082nd Floor · A | 3BHK | 114.67 | 7.12 | 55.76 |
| A2142nd Floor · A | 2BHK | 76.48 | 5.54 | 40.77 | A3013rd Floor · A | 3BHK | 104.83 | 6.64 | 55.76 |
| A3023rd Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A3033rd Floor · A | 3BHK | 104.83 | 6.64 | 58.25 |
| A3043rd Floor · A | 3BHK | 104.83 | 6.64 | 58.62 | A3053rd Floor · A | 3BHK | 104.83 | 6.64 | 55.76 |
| A3063rd Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A3073rd Floor · A | 3BHK | 104.83 | 6.64 | 55.76 |
| A3083rd Floor · A | 3BHK | 114.67 | 7.12 | 55.76 | A3143rd Floor · A | 2BHK | 76.48 | 5.54 | 40.77 |
| A4014th Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A4024th Floor · A | 3BHK | 104.83 | 6.64 | 55.76 |
| A4034th Floor · A | 3BHK | 104.83 | 6.64 | 58.25 | A4044th Floor · A | 3BHK | 104.83 | 6.64 | 58.62 |
| A4054th Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A4064th Floor · A | 3BHK | 104.83 | 6.64 | 55.76 |
| A4074th Floor · A | 3BHK | 104.83 | 6.64 | 55.76 | A4084th Floor · A | 3BHK | 114.67 | 7.12 | 55.76 |
| A4144th Floor · A | 2BHK | 76.48 | 5.54 | 40.77 | B 001Ground Floor · B | 3BHK | 104.83 | 6.64 | 55.76 |
| B 002Ground Floor · B | 3BHK | 104.83 | 6.64 | 58.16 | B 003Ground Floor · B | 3BHK | 104.83 | 6.64 | 58.62 |
| B 004Ground Floor · B | 3BHK | 104.83 | 6.64 | 55.76 | B 005Ground Floor · B | 3BHK | 104.83 | 6.64 | 58.25 |
| B 006Ground Floor · B | 3BHK | 106.90 | 6.64 | 58.25 | B 007Ground Floor · B | 2BHK | 76.48 | 5.54 | 40.77 |
| B 008Ground Floor · B | 3BHK | 106.90 | 6.64 | 58.86 | B 009Ground Floor · B | 3BHK | 106.90 | 6.64 | 55.76 |
| B 010Ground Floor · B | 2BHK | 75.48 | 5.54 | 39.81 | B1011st Floor · B | 3BHK | 104.83 | 6.64 | 55.76 |
| B1021st Floor · B | 3BHK | 104.83 | 6.64 | 58.16 | B1031st Floor · B | 3BHK | 104.83 | 6.64 | 58.62 |
| B1041st Floor · B | 3BHK | 104.83 | 6.64 | 55.76 | B1051st Floor · B | 3BHK | 104.83 | 6.64 | 58.25 |
| B1061st Floor · B | 3BHK | 106.90 | 6.64 | 58.25 | B1071st Floor · B | 2BHK | 76.48 | 5.54 | 40.77 |
| B1081st Floor · B | 3BHK | 106.90 | 6.64 | 58.86 | B1091st Floor · B | 3BHK | 106.90 | 6.64 | 55.76 |
| B1101st Floor · B | 2BHK | 75.48 | 5.54 | 39.81 | B2052nd Floor · B | 3BHK | 104.83 | 13.34 | 58.25 |
| B2062nd Floor · B | 3BHK | 106.90 | 13.52 | 58.25 | B2102nd Floor · B | 2BHK | 75.48 | 10.35 | 39.81 |
| B3053rd Floor · B | 3BHK | 104.83 | 13.34 | 58.25 | B3063rd Floor · B | 3BHK | 106.90 | 13.52 | 58.25 |
| B4054th Floor · B | 3BHK | 104.83 | 13.34 | 58.25 | B4064th Floor · B | 3BHK | 106.90 | 13.52 | 58.25 |
| C 001Ground Floor · C | 3BHK | 104.83 | 6.64 | 55.76 | C 002Ground Floor · C | 3BHK | 104.83 | 6.64 | 55.76 |
| C 003Ground Floor · C | 3BHK | 104.83 | 6.64 | 58.25 | C 004Ground Floor · C | 3BHK | 104.83 | 6.64 | 58.62 |
| C 005Ground Floor · C | 3BHK | 104.83 | 6.64 | 55.76 | C 006Ground Floor · C | 3BHK | 104.83 | 6.64 | 58.25 |
| C 007Ground Floor · C | 3BHK | 106.90 | 6.64 | 55.76 | C 008Ground Floor · C | 2BHK | 76.48 | 5.54 | 40.77 |
| C 009Ground Floor · C | 3BHK | 106.90 | 6.64 | 58.86 | C 010Ground Floor · C | 3BHK | 106.90 | 6.64 | 55.76 |
| C 011Ground Floor · C | 3BHK | 106.90 | 6.64 | 55.76 | C 012Ground Floor · C | 2BHK | 76.48 | 5.54 | 40.43 |
| C1011st Floor · C | 3BHK | 104.83 | 6.64 | 55.76 | C1021st Floor · C | 3BHK | 104.83 | 6.64 | 55.76 |
| C1031st Floor · C | 3BHK | 104.83 | 6.64 | 58.25 | C1041st Floor · C | 3BHK | 104.83 | 6.64 | 58.62 |
| C1051st Floor · C | 3BHK | 104.83 | 6.64 | 55.76 | C1061st Floor · C | 3BHK | 104.83 | 6.64 | 58.25 |
| C1071st Floor · C | 3BHK | 106.90 | 6.64 | 55.76 | C1081st Floor · C | 2BHK | 76.48 | 5.54 | 40.77 |
| C1091st Floor · C | 3BHK | 106.90 | 6.64 | 58.86 | C1101st Floor · C | 3BHK | 106.90 | 6.64 | 55.76 |
| C1111st Floor · C | 3BHK | 106.90 | 6.64 | 55.76 | C1121st Floor · C | 2BHK | 76.48 | 5.54 | 40.43 |
| C2012nd Floor · C | 3BHK | 104.83 | 6.64 | 55.76 | C2022nd Floor · C | 3BHK | 104.83 | 11.45 | 55.76 |
| C2032nd Floor · C | 3BHK | 104.83 | 6.64 | 58.25 | C2042nd Floor · C | 3BHK | 121.16 | 6.64 | 58.62 |
| C2052nd Floor · C | 3BHK | 104.83 | 6.64 | 55.76 | C2062nd Floor · C | 3BHK | 104.83 | 14.60 | 58.25 |
| C2072nd Floor · C | 3BHK | 106.90 | 6.64 | 55.76 | C2082nd Floor · C | 2BHK | 76.48 | 5.54 | 40.77 |
| C2092nd Floor · C | 3BHK | 106.90 | 6.64 | 58.86 | C2102nd Floor · C | 3BHK | 106.90 | 6.64 | 55.76 |
| C2112nd Floor · C | 3BHK | 106.90 | 6.64 | 55.76 | C2122nd Floor · C | 2BHK | 76.48 | 5.54 | 40.43 |
| C3013rd Floor · C | 3BHK | 104.83 | 6.64 | 55.76 | C3063rd Floor · C | 3BHK | 104.83 | 14.60 | 58.25 |
| C3073rd Floor · C | 3BHK | 106.90 | 6.64 | 55.76 | C3083rd Floor · C | 2BHK | 76.48 | 5.54 | 40.77 |
| C3093rd Floor · C | 3BHK | 106.90 | 6.64 | 58.86 | C3103rd Floor · C | 3BHK | 106.90 | 6.64 | 55.76 |
| C3113rd Floor · C | 3BHK | 106.90 | 6.64 | 55.76 | C3123rd Floor · C | 2BHK | 76.48 | 5.54 | 40.43 |
| C4014th Floor · C | 3BHK | 104.83 | 6.64 | 55.76 | C4064th Floor · C | 3BHK | 104.83 | 14.60 | 58.25 |
| C4074th Floor · C | 3BHK | 106.90 | 6.64 | 55.76 | C4084th Floor · C | 2BHK | 76.48 | 5.54 | 40.77 |
| C4094th Floor · C | 3BHK | 106.90 | 6.64 | 58.86 | C4104th Floor · C | 3BHK | 106.90 | 6.64 | 55.76 |
| C4114th Floor · C | 3BHK | 106.90 | 6.64 | 55.76 | C4124th Floor · C | 2BHK | 76.48 | 5.54 | 40.43 |
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
More from VAISHNAVI ANUSHKA INFRASTRUCTURE LLP— the full portfolio →









₹145.86 Cr declared. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
In Karnataka it’s called the guidance value.
No government guidance rate is shown for this project.
Karnataka's guidance-value gazettes are in Horizon's record, but this project's address doesn't name a place any of its sub-registrar's tables print.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (30 Sep 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Has approved 2,111 RERA projects — about 1 in 4 in Karnataka, more than any other body in the state.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
More apartment-heavy than Karnataka overall — 100% apartments here vs 62% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with RERA Karnataka against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
Only what the builder declared, or what RERA Karnataka records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Karnataka, or that this register doesn’t publish it — never that nothing happened.
966 residential projects still under way within 25 km. Step out ring by ring:
Of the 336 projects the radar draws within 6 km — every kind, every stage — 69 are residential projects still under way. This list keeps only those, and looks further out.
5 projects between 1 and 3 km — showing the nearest 5.
Karnataka Slum Development Board · Bengaluru North
KSDB · Hosakote
KARNATAKA SLUM DEVELOPMENT BOARD · Kumta
Magnolia Infrastructure Development Limited · Bengaluru North
FORMIST REALTY PRIVATE LIMITED · Bengaluru North
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you
Where each section of this report comes from.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/vaishnavi-north-24-bengaluru-north-px0vfjq5.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.