HORIZON
Share

WINDERMERE TOWER A

P51700052078 · MahaRERA · https://gethorizon.in/projects/windermere-tower-a-bhayandar-thane-oansw02l

01

Complete project overview

MahaRERA · Registration filing
Project name
WINDERMERE TOWER A
Units
269 units
Floors
37
Buildings
2
Parking
269 spaces
Land area
3,182 sq m
Sanctioned built-up
24,346 sq m
Recreational open space
1,196 sq m

Timeline

RERA registeredJul 2023
Proposed completionDec 2028
TodaySep 2026
Construction progress
Basement (if any)0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Energy managemcnt0%
Fire protection an…0%
Electrical meter r…0%
Aggregate area of …0%
Superstructure5%
Stilt floor75%
Plinth90%
Excavation100%
Podiums100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

A G SUPERSTRUCTURES PRIVATE LIMITED

CompanyPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2023–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
BHAYANDAR
Taluka
Thane
District
Thane
Pincode
401101
Survey no.
NEW S.NO/OLDS.NO/H.NO 221/564/1,3,4A,4B,8 NEW S.NO/H.NO.220/565/1/4,6,7,8,9,10 NEW S.NO/OLD S.NO/H.NO. 267/567/1,2/1 NEW S.NO/OLD S.NO/H.NO 245/579/1A,1B,2,3A,3B,3C,4,5,6,7,8 NEW S.NO/OLD S.NO/H.NO 222/580/1,2,6
North boundary
PLOT NO 266
East boundary
PLOT NO 220
South boundary
18 M ROAD
West boundary
PLOT 244
What’s nearby
SchoolsNearest school 1.3km away
HealthcareHospital 209m away · 1 clinic within 1km · Doctor's clinic within 1km
LifestylePark 809m away · Gym or sports centre 894m away
ShoppingSupermarket 508m away
Getting around
Expressway 4.0 km · Western Express HighwayPrimary road 1.1 kmRailway line 600 mMetro station 372m away (Shahid Bhagat Singh Garden)Limited bus connectivity nearby
Water & environment
Water body 565 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹58,863per sq yd
₹70,400per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “BHAYANDAR”.
In force
2026-2027 schedule
Spread
₹50,251₹85,201 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Mira Bhayander Mahanagarpalika

Building Permit
Survey no. NEW S.NO/OLDS.NO/H.NO 221/564/1,3,4A,4B,8 NEW S.NO/H.NO.220/565/1/4,6,7,8,9,10 NEW S.NO/OLD S.NO/H.NO. 267/567/1,2/1 NEW S.NO/OLD S.NO/H.NO 245/579/1A,1B,2,3A,3B,3C,4,5,6,7,8 NEW S.NO/OLD S.NO/H.NO 222/580/1,2,6
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that approved this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

3,357 residential projects still under way within 25 km. Step out ring by ring:

Of the 772 projects the radar draws within 6 km — every kind, every stage — 293 are residential projects still under way. This list keeps only those, and looks further out.

20 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

WINDERMERE BUILDING NO 1 TO 6

A G SUPERSTRUCTURES PVT LTD · Mira-Bhayandar · Thane

Feb 2023registered
Dec 2027target completion
Government Guidance Rate₹60,034/sq ydScale154 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

WINDERMERE TOWER C

A G SUPERSTRCUTURES PVT LTD · BHAYANDAR · Thane

May 2023registered
Dec 2028target completion
Government Guidance Rate₹58,863/sq ydScale201 flatsAuthorityMahaRERA
140 m awayResidential / Group Housing

Sudama Vallabh wing A,B,C

Pravin Vandravandas Vora · BHAYANDAR · Thane

Oct 2020registered
Jun 2026target completion
Government Guidance Rate₹58,863/sq ydScale199 flatsAuthorityMahaRERA
140 m awayResidential / Group Housing

VAIBHAV SERENITY - WING D

VAIBHAV SIDDHI CONSTRUCTION CO · BHAYANDAR · Thane

Mar 2025registered
Apr 2028target completion
Government Guidance Rate₹58,863/sq ydScale32 flatsAuthorityMahaRERA
150 m awayOthers

MAN MANDIR

TRITONIA BUILDCON AND INFRA PRIVATE LIMITED · BHAYANDER WEST · Chavindra

Jan 2024registered
Dec 2028target completion
Scale350 flatsAuthorityMahaRERA
250 m awayResidential / Group Housing

NARMADALIFESTYLE Building No.3

Chirag Associates · BHAYANDAR · Thane

Jan 2025registered
Dec 2029target completion
Government Guidance Rate₹58,863/sq ydScale54 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.