The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Bandra
Taluka
Andheri
District
Mumbai Suburban
Pincode
400051
Survey no.
629/1258
North boundary
Madhusudan Kalekar Road, Bandra (East)
East boundary
CTS No. 629 (part) of Village -Bandra (East)
South boundary
Bandra Kurla Complex Road, Bandra (East)
West boundary
Patrakar Society Limited, CTS No. 629 (part) of Village Bandra (East)
What’s nearby
SchoolsNearest school 2.0km away · College or university 830m away
HealthcareHospital 403m away · 5 clinics within 1km · Pharmacy within 500m
LifestylePark 1.1km away · Gym or sports centre 273m away · 14+ restaurants and cafes within 1km
ShoppingSupermarket 338m away · Convenience store within 1km · Bank 302m away
Getting around
Expressway 1.6 kmPrimary road 212 m · Bandra Kurla Complex RoadRailway line 1.1 kmMetro station 460m away (Bandra Kurla Complex (BKC))5 bus stops within 500m
Water & environment
Water body 590 mRiver 676 m · Mithi River
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Municipal Corporation of Greater Mumbai
Municipal Corporation · MCGM
Building Permit
Survey no. 629/1258
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation of Greater Mumbai
Municipal corporation
Has approved 2,862 RERA projects — about 1 in 7 in Maharashtra, more than any other body in the state.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
SM12600146
17 Feb 2026
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
Encumbrance
Declared financial encumbrance on the projectworth checking
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,660 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,348 projects the radar draws within 6 km — every kind, every stage — 838 are residential projects still under way. This list keeps only those, and looks further out.