The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Bandra
Taluka
Andheri
District
Mumbai Suburban
Pincode
400051
Survey no.
Survey No 341 pt CTS No 629 pt
North boundary
Building No 74
East boundary
Samaj Seva Building
South boundary
24 40 M W Nana Saheb Dharadhikari Road
West boundary
Internal layout road 9 15 M W
What’s nearby
SchoolsNearest school 1.9km away · College or university 765m away
HealthcareHospital 333m away · 5 clinics within 1km · Pharmacy within 500m
LifestylePark 1.2km away · Gym or sports centre 262m away · 14+ restaurants and cafes within 1km
ShoppingSupermarket 210m away · Convenience store within 1km · Bank 201m away
Getting around
Expressway 1.5 kmPrimary road 324 m · Bandra Kurla Complex RoadRailway line 1.0 kmMetro station 423m away (Bandra Kurla Complex (BKC))5 bus stops within 500m
Water & environment
Water body 720 mRiver 790 m · Mithi River
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Maharashtra Housing and Area Development Authority (MHADA)
Housing Authority
Building Permit
Survey no. Survey No 341 pt CTS No 629 pt
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Maharashtra Housing and Area Development Authority (MHADA)
Planning authority
Has approved 438 RERA projects — 2.2% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
341
On record
13,458 flats · 0 plots
Reach
18 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
SM12600089
23 Jan 2026
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
Encumbrance
Declared financial encumbrance on the projectworth checking
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,663 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,341 projects the radar draws within 6 km — every kind, every stage — 836 are residential projects still under way. This list keeps only those, and looks further out.