Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
160 units across 11 batches
TypeArea sq mCount
1 BHK3610
1 BHK3550
1 RK2420
2 BHK475
2 BHK4710
2 BHK475
1 BHK3610
1 BHK3610
2 BHK4710
1 RK2320
2 BHK4710
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
11,772 homes · 26 plotson the public record across 66 projects
10,77,727 sq mbuilt-up filed
19,164 sq mplotted area
4,83,009 sq mland declared
₹2124.90 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Municipal Corporation of Greater MumbaiMunicipal Corporation7 of 20 projects
Pimpri Chinchwad Municipal CorporationMunicipal Corporation5 of 20 projects
Bmc1 of 20 projects
Mumbai Metropolitan Region Development AuthorityMetropolitan Development Authority1 of 20 projects
Town Planning Office Alibag1 of 20 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Primary road 1.6 kmRailway line 1.2 km · Mumbai - Delhi RailwayRailway station 2.0km away (Umroli)Limited bus connectivity nearby
Water & environment
Water body 1.0 kmCanal 2.5 km
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
A building already stood within ~49 m of the recorded location in 2016 (about 15 m), 14 m in 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~49 m of the filed location.
Satellite photographs of the same ground
Mar 2017Feb 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2016.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~49 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹32,275per sq yd
₹38,600per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Kambalgaon”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
06
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
1 complaint · 1 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC006000000397876
23 Oct 2023
Order Approveddisposed
Court cases, as declared
Declared by the builder
1 case
Number
Forum
Date
84
Additional Dispute Redressal Forum Bandra
2016
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
353 residential projects still under way within 25 km. Step out ring by ring:
Of the 255 projects the radar draws within 6 km — every kind, every stage — 77 are residential projects still under way. This list keeps only those, and looks further out.
8 projects within 1 km — showing the nearest 6.
440 m awayOthers
Luxury Empire Township Phase III
MUNIR ABDULLATIF GAZI · Kambalgaon · Palghar
13 yr 4 mo
Aug 2017registered
Dec 2030target completion
Government Guidance Rate₹32,275/sq ydScale165 flatsAuthorityMahaRERA
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates.
06Complaints & litigation
Complaints before MahaRERA.
Court cases, as declared by the builder, in its MahaRERA filing.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/happinest-boisar-phase-iii-kambalgaon-palghar-tpjq3wgr.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.