This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Units
119 units
Mix
61 × 1 BHK · 56 × 2 BHK · 2 × Unit
Carpet area
31–189 sq mper-unit range, as filed
Floors
18
Buildings
2
Parking
57 spaces
Land area
794 sq m
Sanctioned built-up
5,243 sq m
Timeline
RERA registeredMar 2019
Proposed completionFeb 2023
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
119 units across 6 batches
TypeArea sq mCount
Unit1891
Unit1851
1 BHK482
2 BHK4828
2 BHK4428
1 BHK3159
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Part of Avenue L1-L2-L4 being pt of larger layout bearing survey nos. 5 5B 5D 5F 5G of Village Dongr
North boundary
19deg28m17pts0SN 72deg48m24pts9SN
East boundary
19deg28m16pts2SN 72deg48m25pts3SN
South boundary
19deg28m16pts3SN 72deg48m24pts3SN
West boundary
19deg28m16pts3SN 72deg48m24pts3SN
What’s nearby
Schools1 school within 1km · College or university 1.5km away
HealthcareHospital 1.1km away · Clinic within 2km · Pharmacy within 1km
LifestyleNo parks within 2km · 7 restaurants and cafes within 1km
ShoppingSupermarket 698m away · Mall 415m away
Getting around
Primary road 1.1 km · Veer Savarkar RoadRailway line 521 mRailway station 1.9km away (Virar)Limited bus connectivity nearby
Water & environment
Water body 1.3 km · Ram mandir Lake
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹27,258per sq yd
₹32,600per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Dongare”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Vasai Virar City Municipal Corporation
Municipal Corporation
Building Permit
Survey no. Part of Avenue L1-L2-L4 being pt of larger layout bearing survey nos. 5 5B 5D 5F 5G of Village Dongr
The promised possession date (28 Feb 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Vasai Virar City Municipal Corporation
Municipal corporation
Has approved 627 RERA projects — 3.1% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
513
On record
8,010 flats · 60 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
Court cases, as declared
Declared by the builder
1 case
Number
Forum
Date
7413
Bombay High Court
2017
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
958 residential projects still under way within 25 km. Step out ring by ring:
Of the 513 projects the radar draws within 6 km — every kind, every stage — 246 are residential projects still under way. This list keeps only those, and looks further out.
12 projects within 1 km — showing the nearest 6.
400 m awayResidential / Group Housing
NIVANTA
MANGALMURTI UNIQUE REALTY LLP · VILLAGE - DONGARE · Vasai