HORIZON
Share

Infinity Tower

PM1181012601612 · MahaRERA · https://gethorizon.in/projects/infinity-tower-oshiwara-andheri-s8u5tbhe

01

Complete project overview

MahaRERA · Registration filing
Units
234 units
Floors
33
Buildings
2
Parking
246 spaces
Land area
2,491 sq m
Sanctioned built-up
15,651 sq m

Timeline

RERA registeredAug 2026
Proposed completionDec 2030
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Street Lighting0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Energy managemcnt0%
Fire protection an…0%
Electrical meter r…0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

M/s. Rassaz Infrastructure Private Limited

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Oshiwara
Taluka
Andheri
District
Mumbai Suburban
Pincode
400102
Survey no.
26A, 27(PT.), 28(PT.), 96(PT)
North boundary
D P ROAD NEW LINK ROAD
East boundary
INTERNAL ROAD 915
South boundary
JOHIG HOUSING SOCIETY
West boundary
GREEN DIAMOND BUILDING/ SATPUDA BUILDING
What’s nearby
SchoolsNearest school 1.0km away · College or university 1.8km away · Library 1.6km away
HealthcareHospital 485m away · 3 clinics within 1km · Pharmacy within 1km
LifestylePark 1.4km away · Gym or sports centre 1.1km away · 19+ restaurants and cafes within 1km
ShoppingSupermarket 740m away · Mall 1.2km away · Convenience store within 1km
Getting around
Expressway 1.6 kmPrimary road 302 m · Swami Vivekanand RoadRailway line 1.0 km · Central Railway (Harbour Line)Metro station 724m away (Goregaon (West))4 bus stops within 500m
Water & environment
River 356 m · Oshiwara RiverWater body 426 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation
Building Permit
Survey no. 26A, 27(PT.), 28(PT.), 96(PT)
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,715 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,240 projects the radar draws within 6 km — every kind, every stage — 762 are residential projects still under way. This list keeps only those, and looks further out.

34 projects within 1 km — showing the nearest 6.

10 m awayMixed

Veena Insignia

Veena Infratech LLP · Others · CTSO Andheri

Oct 2024registered
Mar 2028target completion
Scale217 flatsAuthorityMahaRERA
10 m awayOthers

Navrang Atlantis

Oxford Worldone Realty LLP · Oshiwara · Andheri

May 2025registered
Jan 2029target completion
Government Guidance Rate₹1,76,222/sq ydScale120 flatsAuthorityMahaRERA
10 m awayMixed

Sheetal Sky

D.G.S. Land Developers (India) Pvt Ltd · Oshiwara · Andheri

Jun 2025registered
Dec 2030target completion
1 open complaintGovernment Guidance Rate₹2,08,346/sq ydScale135 flatsAuthorityMahaRERA
10 m awayMixed

Sheetal Sky Tower B

D.G.S. Land Developers (India) Pvt Ltd · Oshiwara · Andheri

Sep 2025registered
Dec 2030target completion
Government Guidance Rate₹2,08,346/sq ydScale143 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

Sovrano Tower C

Lodha Developers Limited · Oshiwara · Andheri

Dec 2025registered
Dec 2030target completion
Government Guidance Rate₹1,11,531/sq ydScale120 flatsAuthorityMahaRERA
10 m awayOthers

Lashkaria Solitaire

RELLIANCE REALTY · Andheri

Dec 2022registered
Oct 2026target completion
Scale55 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.