This project’s RERA Assam registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with RERA Assam before you rely on anything below.
01
Complete project overview
RERA Assam · Registration filing
Registration category
ONGOINGnew vs ongoing at registration
Apartments / villas
865 units
Land area
2,916 sq m
Local land measure
2 BIGHA 18 LECHA
Parking
176 spaces
RERA validity
31 Dec 2021this validity has passed
Timeline
RERA registeredNov 2017
Proposed completionDec 2021
TodaySep 2026
Construction progress
100% overall, as filed
Self-declared % complete as filed with RERA Assam when this ongoing project was registered — a snapshot at registration, not a live tracker.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNo schools within 2km · College or university 1.5km away
HealthcareHospital 515m away · 1 clinic within 1km
LifestyleNo parks within 2km · Gym or sports centre 2.0km away · 8 restaurants and cafes within 1km
ShoppingSupermarket 1.4km away · Mall 1.5km away · Convenience store within 1km
Getting around
Expressway 846 m · Basistha Chariali FlyoverPrimary road 2.6 kmNo metro or railway within 5kmBus stop within 1km
Water & environment
River 923 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹10.08 Cr declared to build 865 flats. What that works out to:
₹1.16 Lakhdeclared cost per flatall-in — land + construction
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Assam registration department
No government guidance rate is shown for this project.
Assam's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RERA Assam · Approved building plan
Guwahati Municipal Corporation
Municipal Corporation
Building Permitapproved 17 May 2017 · 9 yrs ago
The promised possession date (31 Dec 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Guwahati Municipal Corporation
Municipal corporation / board
Has approved 604 RERA projects — about 1 in 1 in Assam, more than any other body in the state.
an apartments market — 98% apartments · 2% plotted layouts. Apartments like yours are this body's core business.
Builders
488
On record
45,695 flats · 10,758 plots
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Assam doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Assam
Litigation
None declared in this filing
Only what the builder declared, or what RERA Assam records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Assam, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
243 residential projects still under way within 25 km. Step out ring by ring:
Of the 422 projects the radar draws within 6 km — every kind, every stage — 106 are residential projects still under way. This list keeps only those, and looks further out.
No government guidance rate could be matched to this project from Assam's published schedules.
05Planning authority
RERA Assam: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
06Complaints & litigation
RERA Assam's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/swastik-elite-guwahati-kamrup-metro-v1v3y902.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.