The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
RERA Karnataka · Registration filing
Taluk
Anekal
District
Bengaluru Urban
Address
69/2 kallballu Village, 69/3 Kallballu Village
What’s nearby
Schools1 school within 500m · Library 1.8km away
HealthcareHospital 428m away · 8 clinics within 1km · Pharmacy within 500m
LifestyleNo parks within 2km · Gym or sports centre 421m away · 29+ restaurants and cafes within 1km
ShoppingSupermarket 480m away · Mall 409m away · Convenience store within 500m
Getting around
Primary road 365 m · Varthur Main RoadRailway line 4.7 kmRailway station 4.7km away (Belandur Road)3 bus stops within 500m
Water & environment
Water body 40 mRiver 516 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹5.30 Cr declared to build 91 plots. What that works out to:
₹5.82 Lakhdeclared cost per plotall-in — land + construction
₹497/sq ftof plotted area₹5,349/sq m
981%of the cost is land₹4,876/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Karnataka registration department
In Karnataka it’s called the guidance value.
No government guidance rate is shown for this project.
Karnataka's guidance-value gazettes are in Horizon's record, but this project's address doesn't name a place any of its sub-registrar's tables print.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RERA Karnataka · Approved building plan
BMRDA - Bangalore Metropolitan Region Development Authority
Urban Development Authority
Layout Permit
The promised possession date (31 Dec 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
BMRDA
Urban Development Authority · Bangalore Metropolitan Region Development Authority
Has approved 550 RERA projects — about 1 in 16 in Karnataka.
a mixed market — 46% apartments · 54% plotted layouts.
Builders
441
On record
16,246 flats · 16,792 plots
Reach
14 taluks
Since
2017
More layout-heavy than Karnataka overall — 54% plots here vs 38% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with RERA Karnataka against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to RERA Karnataka
Litigation
None declared in this filing
Only what the builder declared, or what RERA Karnataka records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Karnataka, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
192 plotted projects still under way within 25 km. Step out ring by ring:
Of the 406 projects the radar draws within 6 km — every kind, every stage — 13 are plotted projects still under way. This list keeps only those, and looks further out.
2 projects between 1 and 3 km — showing the nearest 2.