HI POINT ROYAL
HI POINT CONSTRUCTIONS PRIVATE LIMITED
ND Samruddhi
Timeline
Every flat the builder registered. Look yours up and check it is on the record.
Areas are not shown for this project. The sizes filed against these flats are not credible — units recorded as 2 and 3 BHK are filed at sizes no flat is, which usually means square feet were entered in a column the register labels square metres. Publishing those as the registered carpet area would be worse than publishing nothing. The flat numbers and types above are the register’s.
| Unit | Type | Unit | Type |
|---|---|---|---|
| 11st Floor | 2BHK | 21st Floor | 2BHK |
| 31st Floor | 2BHK | 41st Floor | 2BHK |
| 51st Floor | 2BHK | 1012nd Floor | 2BHK |
| 1022nd Floor | 2BHK | 1032nd Floor | 2BHK |
| 1042nd Floor | 2BHK | 1052nd Floor | 2BHK |
| 2013rd Floor | 2BHK | 2023rd Floor | 2BHK |
| 2033rd Floor | 2BHK | 2043rd Floor | 2BHK |
| 2053rd Floor | 2BHK | 5014th Floor | 2BHK |
| 3024th Floor | 2BHK | 3034th Floor | 2BHK |
| 3044th Floor | 2BHK | ||
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.






₹5.00 Cr declared. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Open ground within ~20 m of the recorded location until 2016; a building is first visible in 2017 and is about 8 m tall by 2023.
Satellite view, year by year
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.
Satellite photographs of the same ground
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
In Karnataka it’s called the guidance value.
No government guidance rate is shown for this project.
Karnataka's guidance-value gazettes are in Horizon's record, but this project's address doesn't name a place any of its sub-registrar's tables print.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (30 Sep 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Has approved 134 RERA projects — 1.5% of Karnataka.
an apartments market — 87% apartments · 13% plotted layouts. Apartments like yours are this body's core business.
More apartment-heavy than Karnataka overall — 87% apartments here vs 62% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with RERA Karnataka against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
Only what the builder declared, or what RERA Karnataka records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Karnataka, or that this register doesn’t publish it — never that nothing happened.
68 residential projects still under way within 25 km. Step out ring by ring:
Of the 110 projects the radar draws within 6 km — every kind, every stage — 40 are residential projects still under way. This list keeps only those, and looks further out.
4 projects within 1 km — showing the nearest 4.
HI POINT CONSTRUCTIONS PRIVATE LIMITED
BHAVANI BUILDERS & DEVELOPERS
SHIVALAYA DEVELOPERS
SOVEREIGN PROPERTIES
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.
What this record cannot tell you
Where each section of this report comes from.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/nd-samruddhi-udupi-t3k7hiam.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.