HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

Mandavi Acropolis Tower-E

PRM/KA/RERA/1273/318/PR/180131/001349 · RERA Karnataka · https://gethorizon.in/projects/mandavi-acropolis-tower-e-udupi-53xsg679

01

Complete project overview

RERA Karnataka · Registration filing
Project name
Mandavi Acropolis Tower-E
Towers
1
Land area
3,035 sq m
FAR sanctioned
2.28
Covered area
932 sq m
Open area
2,101 sq m

Timeline

Project startedApr 2017
RERA registeredJan 2018
Proposed completionDec 2018
TodaySep 2026

Find your flat

Every flat the builder registered. Look yours up and check it is on the record.

UnitType
1Ground Floor3BHK
2Ground Floor3BHK
3Ground Floor3BHK
4Ground Floor3BHK
5Ground Floor3BHK
6Ground Floor3BHK
11st Floor3BHK
21st Floor3BHK
31st Floor3BHK
41st Floor3BHK
51st Floor3BHK
61st Floor3BHK
12nd Floor3BHK
22nd Floor3BHK
32nd Floor3BHK
42nd Floor3BHK
52nd Floor3BHK
62nd Floor3BHK
13rd Floor3BHK
23rd Floor3BHK
33rd Floor3BHK
43rd Floor3BHK
53rd Floor3BHK
63rd Floor3BHK
14th Floor3BHK
24th Floor3BHK
34th Floor3BHK
44th Floor3BHK
54th Floor3BHK
64th Floor3BHK
15th Floor3BHK
25th Floor3BHK
35th Floor3BHK
45th Floor3BHK
55th Floor3BHK
65th Floor3BHK
16th Floor3BHK
26th Floor3BHK
36th Floor3BHK
46th Floor3BHK
56th Floor3BHK
66th Floor3BHK
17th Floor3BHK
27th Floor3BHK
37th Floor3BHK
47th Floor3BHK
57th Floor3BHK
67th Floor3BHK
18th Floor3BHK
28th Floor3BHK
38th Floor3BHK
48th Floor3BHK
58th Floor3BHK
68th Floor3BHK
19th Floor3BHK
29th Floor3BHK
39th Floor3BHK
49th Floor3BHK
59th Floor3BHK
69th Floor3BHK

Areas are not shown for this project. The sizes filed against these flats are not credible — units recorded as 2 and 3 BHK are filed at sizes no flat is, which usually means square feet were entered in a column the register labels square metres. Publishing those as the registered carpet area would be worse than publishing nothing. The flat numbers and types above are the register’s.

All 60 units as filed, two to a row · areas in sq m
UnitTypeUnitType
1Ground Floor3BHK2Ground Floor3BHK
3Ground Floor3BHK4Ground Floor3BHK
5Ground Floor3BHK6Ground Floor3BHK
11st Floor3BHK21st Floor3BHK
31st Floor3BHK41st Floor3BHK
51st Floor3BHK61st Floor3BHK
12nd Floor3BHK22nd Floor3BHK
32nd Floor3BHK42nd Floor3BHK
52nd Floor3BHK62nd Floor3BHK
13rd Floor3BHK23rd Floor3BHK
33rd Floor3BHK43rd Floor3BHK
53rd Floor3BHK63rd Floor3BHK
14th Floor3BHK24th Floor3BHK
34th Floor3BHK44th Floor3BHK
54th Floor3BHK64th Floor3BHK
15th Floor3BHK25th Floor3BHK
35th Floor3BHK45th Floor3BHK
55th Floor3BHK65th Floor3BHK
16th Floor3BHK26th Floor3BHK
36th Floor3BHK46th Floor3BHK
56th Floor3BHK66th Floor3BHK
17th Floor3BHK27th Floor3BHK
37th Floor3BHK47th Floor3BHK
57th Floor3BHK67th Floor3BHK
18th Floor3BHK28th Floor3BHK
38th Floor3BHK48th Floor3BHK
58th Floor3BHK68th Floor3BHK
19th Floor3BHK29th Floor3BHK
39th Floor3BHK49th Floor3BHK
59th Floor3BHK69th Floor3BHK
02

Builder’s track record

RERA Karnataka · Builder registration

Dr Jerry Vincent Dias

UdupiBased in
3Projects
1City
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
3 projectson the public record across 3 projects
17,291 sq mland declared
₹96.02 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Dr Jerry Vincent Dias— the full portfolio →

03

Location & price analysis

RERA Karnataka · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 17 new projects last year
  • 154 nearby projects
1 km radius · coordinates as filed · 13.3380, 74.7470 · © OpenStreetMap contributors
Taluk
Udupi
District
Udupi
Address
Behind Udupi city municipality, K M Marg Udupi
What’s nearby
Schools1 school within 500m · 7 educational institutions within 1km · College or university 791m away
HealthcareHospital 224m away · 8 clinics within 1km · Pharmacy within 500m
LifestyleNo parks within 2km · 21+ restaurants and cafes within 1km
ShoppingSupermarket 1.3km away · Mall 739m away · Convenience store within 500m
Getting around
Expressway 666 m · Malpe - Manipal RoadPrimary road 297 m · Kavi Muddana MargRailway line 2.6 km · Konkan RailwayRailway station 2.6km away (Udupi)Bus stop within 1km
Water & environment
Water body 639 m · Temple Pushkarini
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹25.93 Cr declared. What that works out to:

4%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

Open ground within ~31 m of the recorded location until 2016; a building is first visible in 2017 and is about 25 m tall by 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~31 m of the filed location.

Satellite photographs of the same ground

Jan 2017
Jan 2023
Feb 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2017.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
  • Site is a ~31 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
  • Coordinate checked only against its district, not its pincode.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Karnataka registration department

In Karnataka it’s called the guidance value.

No government guidance rate is shown for this project.

Karnataka's guidance-value gazettes are in Horizon's record, but this project's address doesn't name a place any of its sub-registrar's tables print.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Planning authority

RERA Karnataka · Approved building plan

Udupi Urban Development Authority

Urban Development Authority
Building Permit

The promised possession date (31 Dec 2018) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Udupi Urban Development Authority

Urban Development Authority

Has approved 134 RERA projects1.5% of Karnataka.

an apartments market87% apartments · 13% plotted layouts. Apartments like yours are this body's core business.

Builders
112
On record
3,485 flats · 325 plots
Reach
6 taluks
Since
2017

More apartment-heavy than Karnataka overall — 87% apartments here vs 62% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Karnataka

08

Other projects nearby

The register · within 25 km

63 residential projects still under way within 25 km. Step out ring by ring:

Of the 154 projects the radar draws within 6 km — every kind, every stage — 51 are residential projects still under way. This list keeps only those, and looks further out.

6 projects within 1 km — showing the nearest 6.

620 m awayApartment

RAMA RANGA

V.P BUILDERS · Udupi

Jan 2026started
Dec 2030target completion
Declared cost₹5.02 CrScale16 flatsAuthorityRERA Karnataka
620 m awayApartment

ASHIRVAD

UDUPI AASHEERVAAD DEVELOPERS · Udupi

Nov 2023started
Dec 2027target completion
Declared cost₹3.92 CrScale13 flatsAuthorityRERA Karnataka
720 m awayApartment

PARIPOORNA

PRATHIK U RAO & POORNIMA P RAO · Udupi

May 2026started
Dec 2031target completion
Declared cost₹14.29 CrScale23 flatsAuthorityRERA Karnataka
810 m awayApartment

SHIVANSH

BHARATH DEVELOPERS · Udupi

Sep 2022started
Dec 2027target completion
Declared cost₹24.65 CrScale46 flatsAuthorityRERA Karnataka
900 m awayApartment

SAI RADHA NITHYADHAM

MS SAI RADHA DEVELOPERS · Udupi

Jan 2022started
Dec 2027target completion
Declared cost₹18.42 CrScale52 flatsAuthorityRERA Karnataka
910 m awayApartment

KIRTHI PALMVILLE PHASE II

KIRTHI CONSTRUCTION · Udupi

Feb 2022started
Dec 2029target completion
Declared cost₹149.94 CrScale330 flatsAuthorityRERA Karnataka

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with RERA Karnataka, as the builder submitted it.
  2. 02Builder's track record
    • RERA Karnataka: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location & price analysis
    • Address, pincode and declared cost: the RERA Karnataka filing.
    • Coordinates: as filed with RERA Karnataka.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Karnataka's published schedules.
  6. 06Planning authority
    • RERA Karnataka: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • RERA Karnataka's public record lists no complaints or litigation for this project.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/mandavi-acropolis-tower-e-udupi-53xsg679.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.