RAJ/P/2018/604 · RAJ-RERA · https://gethorizon.in/projects/hyde-park-sanganer-jaipur-561wvmq0

01

Complete project overview

RAJ-RERA · Registration filing
Land area
19,582 sq m
Description
Due to mistake land and development cost was not filled. Therefor to correct our fault we are providing details here as: Land cost as per rule 5(1)=25,20,39,344/- Development cost as per rule 5(2)=1,87,01,92,500/- TOTAL COST OF THE PROJECT=2,12,22,31,844/-. EWS/LIG Flats have been constructed at other site as per rules and handed over to JDA, Jaipur. The total area of projectis 19582.00 sq.mtr. . The phase area for phase 1 was filled as 19582 sq. mtr. by mistake, the phase-1 area should be read as 15077.49 sq.mtr. and the same has been marked on the drawings uploaded.

Timeline

Construction startJun 2014
RERA registeredJan 2018
Proposed completionMay 2021
TodaySep 2026
02

Builder’s track record

RAJ-RERA · Builder registration

ADARSH BUILDESTATE LIMITED

OrganisationPromoter type
Jaipur, RajasthanBased in
3Projects
2Cities
2017–2021Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
3 projectson the public record across 3 projects
3,40,805 sq mbuilt-up filed
73,355 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from ADARSH BUILDESTATE LIMITED— the full portfolio →

03

Location

RAJ-RERA · Registration filing
Address
KHASRA NO 166/402/167, SANGANER, GRAM DURGAPURA, Sanganer, Jaipur, 302017
Village
GRAM DURGAPURA
Taluka
Sanganer
District
Jaipur
Pincode
302017
What’s nearby
SchoolsNo schools within 2km · College or university 934m away
HealthcareHospital 901m away · 6 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 752m away · Mall 1.8km away
Getting around
Expressway 1.8 kmPrimary road 831 m · B2 Bypass RoadRailway line 166 m · Jaipur to Sawai Madhopur LineRailway station 992m away (Durgapura)Limited bus connectivity nearby
Water & environment
Water body 1.3 km · Dravyavati River
distances only — not a flood assessment
04

Government Guidance Rate

Rajasthan IGRS — DLC rates

In Rajasthan it’s called the DLC rate.

₹25,084per sq yd
₹30,000per sq m
Which rate
residential, interior plot
Matched to
The rate published for “Durga Pura”.
Highest rate
₹40,134 per sq yd — the top road-facing rate among the residential rates published for this colony

By the road it faces

interior plot₹30,000 / sq m₹25,084 / sq yd
road-facing₹40,000 / sq m₹33,445 / sq yd
41–60 ft road₹44,000 / sq m₹36,790 / sq yd
61–99 ft road₹46,000 / sq m₹38,462 / sq yd
100 ft+ road₹48,000 / sq m₹40,134 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this colony.

What this number is — and isn’t

  • The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
05

Planning authority

RAJ-RERA · Approved building plan
Building Permitapproved 11 Jan 2018 · 8 yrs ago

The promised possession date (31 May 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

421 residential projects still under way within 25 km. Step out ring by ring:

Of the 472 projects the radar draws within 6 km — every kind, every stage — 124 are residential projects still under way. This list keeps only those, and looks further out.

2 projects within 1 km — showing the nearest 2.

440 m awayGroup Housing

LIVGYAN

AR INFRA · Jaipur

Nov 2024registered
Dec 2027target completion
Declared cost₹20.07 CrScale60 flatsAuthorityRAJ-RERA
890 m awayGroup Housing

AMD AMBROSIA

AMD CONSTRUCTION · Sanganer · Jaipur

Mar 2024registered
Jul 2026target completion
Declared cost₹9.30 CrScale30 flatsAuthorityRAJ-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RAJ-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RAJ-RERA does not publish a complaints register. This read cannot speak to them either way.