2 extensions on record — latest to 30 Aug 2022declared reason: force majeure
Description
The detail of senctioned no. of apartment/plots was wrongly filled as 521, this has been rectified on 04/12/2017 and the revised rectified no. is 531.
Remark About Project
1. The previously mentioned account details of the project account were :-
A/C No. :- 154902000004578
Bank Name :- Indian Overseas Bank
Branch :- MALVIYA NAGART, Jaipur
2. Based on the required of the promoters the account details has been changed on 23.02.2018
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNo schools within 2km · College or university 886m away
HealthcareHospital 684m away · 4 clinics within 1km · Doctor's clinic within 1km
LifestylePark 1.7km away
ShoppingSupermarket 658m away · ATM within 500m
Getting around
Expressway 1.7 kmPrimary road 1.2 kmRailway line 480 mRailway station 778m away (Durgapura)Limited bus connectivity nearby
Water & environment
Water body 1.6 km · Dravyavati River
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹41.73 Cr declared. What that works out to:
4%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Jaipur Development Authority
Development Authority
Building Permitapproved 17 Oct 2017 · 8 yrs ago
The promised possession date (30 Aug 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Jaipur Development Authority
Development authority
Has approved 644 RERA projects — about 1 in 3 in Rajasthan, more than any other body in the state.
a mixed market — 52% apartments · 48% plotted layouts.
Builders
528
On record
15,937 flats · 30,970 plots
Reach
2 districts
Since
2017
More apartment-heavy than Rajasthan overall — 52% apartments here vs 34% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
421 residential projects still under way within 25 km. Step out ring by ring:
Of the 486 projects the radar draws within 6 km — every kind, every stage — 130 are residential projects still under way. This list keeps only those, and looks further out.