13 of 44 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,690 sq m
Floor area
6,856 sq m
Description
USHAKIRAN
Timeline
Project startedMar 2016
RERA registeredFeb 2023
Proposed completionApr 2024
TodaySep 2026
Construction progress
41% overall, as filed
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Slabs of Super Structure6%
Excavation100%
Basement(s) and Plinth100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
31 of 44 available
TypeArea sq mAvailable
2BHK546 of 11
2BHK575 of 11
3BHK9110 of 11
4BHK10510 of 11
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.
Complete project overview — done
02
Builder’s track record
K-RERA · Builder registration
GANGOTHRI BUILDERS AND DEVELOPERS
PartnershipPromoter type
Thiruvananthapuram, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
K-RERA · Registration filing
Street
KAIMANAM-THIRUVALLAM ROAD
Village
NEMOM
Taluk
THIRUVANANTHAPRUAM
District
Thiruvananthapuram
Pincode
695002
Survey no.
240-10
Patta no.
12151
What’s nearby
Schools1 school within 1km · Library 75m away
HealthcareHospital 1.3km away
LifestylePark 1.9km away · Gym or sports centre 847m away
ShoppingSupermarket 1.3km away · Mall 1.5km away
Getting around
Expressway 3.0 km · Salem - Kochi - Kanyakumari RoadPrimary road 1.3 km · Thiruvananthapuram - Nagercoil HighwayRailway line 1.9 kmRailway station 3.7km away (Thiruvananthapuram Central)Bus stop within 500m
Water & environment
River 139 m · Karamana RiverWater body 174 m
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Location — done
04
Government Guidance Rate
Kerala Registration Department — fair value
In Kerala it’s called the fair value.
₹5,518per sq yd
₹6,600per sq m
Which rate
Residential Plot without vehicular access
Matched to
The rate published for the village of “Nemam”.
What this number is — and isn’t
The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
K-RERA · Approved building plan
Trivandrum Municipal Corporation
Municipal Corporation
approved 26 Mar 2015 · 11 yrs ago
Building Permit no. NZ/BA/395/2013Survey no. 240-10
The promised possession date (30 Apr 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan NZ/BA/395/2013 on the approving authority’s portal to confirm the approval.
The approving body, at scale
Trivandrum Municipal Corporation
Municipal corporation / municipality
Has approved 43 RERA projects — 2.8% of Kerala.
an apartments market — 81% apartments · 19% plotted layouts. Apartments like yours are this body's core business.
Builders
24
On record
1,888 flats · 188 plots
Since
2021
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
Cases listed on K-RERA's project page
Listed on K-RERA's project page
5 cases · 0 disposed · 5 open
Number
Forum
Date
Status
105 106 108
K RERA
2022
Pending
286 287 288 299
K RERA
2021
Pending
304
K RERA
2020
Pending
306
RERA
2020
Pending
312
K RERA
2020
Pending
What the builder declared
Declared to K-RERA
Litigation
A litigation is declared on record — verify directly with K-RERAworth checking
The builder's own declaration at registration — not a court's or K-RERA's finding. A flagged line is worth checking with K-RERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
166 residential projects still under way within 25 km. Step out ring by ring:
Of the 94 projects the radar draws within 6 km — every kind, every stage — 33 are residential projects still under way. This list keeps only those, and looks further out.
3 projects between 1 and 3 km — showing the nearest 3.
MANACAUDResidential (Apartment)
White Maanor
Chothy's Building Promoters Pvt Ltd
3 yr 11 mo
Sep 2023registered
Aug 2027target completion
Government Guidance Rate₹22,074/sq ydScale27 flatsAuthorityK-RERA