HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
42 units
Mix
14 × 1BHK · 14 × 3BHK · 14 × 2BHK
Booked
24 of 42 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,967 sq m
Floor area
5,186 sq m
Description
VISTA RIO

Timeline

Project startedFeb 2022
RERA registeredMay 2022
Proposed completionDec 2026
TodayJul 2026
Construction progress

36% overall, as filed

Sanitary Fittings0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Electrical Fittings10%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings50%
Staircases, Lifts Wells80%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Completion of terraces floor each building100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

18 of 42 available
TypeArea sq mAvailable
1BHK4211 of 14
3BHK953 of 7
3BHK894 of 7
2BHK650 of 14

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

KSEB OFFICERS HOUSE CONSTRUCTION COOPERATIVE SOCIETY

SocietiesPromoter type
Thiruvananthapuram, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
AKKULAM
Village
ATTIPRA
Taluk
THIRUVANANTHAPRUAM
District
Thiruvananthapuram
Pincode
695011
Survey no.
386/5-2
Patta no.
20411
What’s nearby
Schools1 school within 500m · 4 educational institutions within 1km · College or university 989m away
HealthcareHospital 264m away · 3 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 693m away · 13+ restaurants and cafes within 1km
ShoppingSupermarket 605m away · Mall 435m away · Convenience store within 500m
Getting around
Expressway 2.5 km · Salem - Kochi - Kanyakumari Road FlyoverPrimary road 213 m · Murinjapalam - Medical College RoadRailway line 2.2 kmRailway station 2.3km away (Thiruvananthapuram Pettah)7 bus stops within 500m
Water & environment
Water body 20 m · Veliyoorkonam thamarabhagam kulamRiver 466 m · Amayizhachan thodu
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Thiruvananthapuram

Local body (LSGI)
approved 30 Dec 2021 · 4 yrs ago
Building Permit no. ZAE/BA/312/2020(ZAE/4533/2020)Survey no. 386/5-2
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan ZAE/BA/312/2020(ZAE/4533/2020) on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Thiruvananthapuram

Local body

Has approved 15 RERA projects1% of Kerala.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
13
On record
964 flats · 0 plots
Since
2021

More apartment-heavy than Kerala overall — 100% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.