HORIZON
Share

SOBHA MEADOWS WHISPERING HILL

T1/OL/197/2022 · K-RERA · https://gethorizon.in/projects/sobha-meadows-whispering-hill-cheruvakkal-thiruvananthapuram-hypb0pps

01

Complete project overview

K-RERA · Registration filing
Project name
SOBHA MEADOWS WHISPERING HILL
Units
98 units
Mix
25 × A1 · 25 × A2 · 24 × B1 · 24 × B2
Booked
96 of 98 filed sold/bookedas declared in the RERA filing
Buildings
2
Land area
7,985 sq m
Floor area
21,708 sq m
Description
SOBHA MEADOWS WHISPERING HILL

Timeline

RERA registeredAug 2022
Project startedDec 2022
Proposed completionDec 2027
TodaySep 2026
Construction progress

9% overall, as filed

Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Basement(s) and Plinth39%
Basement(s) and Plinth52%
Excavation100%
Excavation100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your unit

Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.

2 of 98 available
TypeArea sq mAvailable
A11431 of 25
A21431 of 25
B11130 of 24
B21130 of 24

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

SOBHA LIMITED

CompanyPromoter type
Thiruvananthapuram, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
146Projects
12Cities
2017–presentActive
Timelineevery project, start → promised completion
Sobha IndraprasthaSobha City - Casa Paradiso Block 4Sobha Silicon Oasis Phase 1 Wing 1, 2, 3, 4, 5 & 6Sobha Dream Acres - Rain forest Phase 15 Wing 17Sobha Silicon Oasis Phase 6 Block 2 and 3 (Row house No. 1 to 8 & 11 to 17)Sobha Silicon Oasis Phase 7 Block 2 and 3 (Row House No. 9, 10)Sobha Arena - The Park ( Block 2 )Sobha Arena - The Plaza (Block 3)Sobha Silicon Oasis Phase 2 Wing 7Sobha Valley View - HeritageSobha Silicon Oasis Phase 3 Wing 8Sobha Dream Acres - Rain Forest Phase 5 Wing 16Sobha AvenueSobha ClovellySobha Dream Acres - Tropical Greens Phase 8 Wing 43 and 44Sobha Dream Acres - Tropical Greens Phase 7 Wing 42Sobha Dream Acres - Tropical Greens Phase 6 Wing 41Sobha Silicon Oasis Phase 5 Wing 10 & 11Sobha Dream Acres - Rain Forest Phase 2 Wing 3 and 4Sobha Silicon Oasis Phase 4 Wing 9Sobha Dream Acres - Tropical Greens Phase 9 Wing 45Sobha Bela Encosta Phase-1Marina One Phase - 4Marina One Phase-5Marina One Phase-1Marina One Phase 2Marina One Phase 3Sobha Dream Acres - Rain forest Phase 1 Wing 1 and 2Sobha Palm CourtSobha Dream Acres - Palm Springs Phase 13 Wing 52Sobha Morzaria Grandeur 2 (W1)Sobha Dream Acres - Rain Forest Phase 4 Wing 11Sobha Dream Acres - Palm Springs Phase 11 Wing 47Sobha Atlantis Phase 1 block 3 and 4Sobha Atlantis Phase 2 block 1 and 2Sobha Dream Acres - Tropical Greens Phase 10 Wing 46Sobha 25 RichmondSobha Dream Acres - Palm Springs Phase 12 Wing 48 and 49Sobha Dream Acres - Rain Forest Phase 3 Wing 5 and 6Sobha Dream Acres - Palm Springs Phase 14 Wing 53Sobha Dream Acres - Palm Springs Phase 17 Wing 54Sobha Dream Acres - Tropical Greens Phase 18 Wing 39 and 40Sobha HRC Pristine Phase 4 Block 4 and 5Sobha - HRC Pristine Phase 3 Block 3Sobha HRC Pristine Phase 2 Block 2Sobha HRC Pristine Phase 1 Block 1Sobha Arena - Pebble Court (Block 1)Sobha Arena - The Square (Block 4)Sobha Forest EdgeSobha Dream Acres - Tropical Greens Phase 19 Wings 19 and 20Sobha MeadowsSobha Dream Acres - Tropical Greens Phase 20 Wing 18Sobha Lake Gardens Phase 1Sobha Lake Gardens Phase 2Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 and 24Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 and 22Sobha Dream Acres - Tropical Greens Phase 23 Wing 25, 26, 27 and 28Sobha Dream Acres - Tropical Greens Phase 24 Wing 29 and 30Sobha Dream Acres - Tropical Greens Phase 25 Wing 32, 33 and 34Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38Sobha Dream Gardens Phase 2 – Wing 5, 6 and 7Sobha Dream Gardens Phase 1 – Wing 8 and 9Sobha Dream Gardens Phase 3 – Wing 3 and 4Sobha Dream Gardens Phase 4 – Wing 1 and 2Sobha Dream Gardens Phase 5 – Wing 10Sobha RajvilasSobha Royal Pavilion Phase 1 - Wing 6 and 7Sobha Royal Pavilion Phase 8 - Wing 15Sobha Royal Pavilion Phase 2 - Wing 4 and 5Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3Sobha Royal Pavilion Phase 6 - Wing 10 and 11Sobha Royal Pavilion Phase 5 - Wing 8 and 9Sobha Royal Pavilion Phase 3 - Wing 16Sobha Dream Acres - Palm Springs Phase 16 Wing 50SOBHA NESARA BLOCK-2SOBHA NESARA BLOCK-1SOBHA NESARA BLOCK-3Sobha Dream HeightsSobha PalaciaSobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58Sobha City AthenaSobha Windsor Phase 2 Wing 3, 4 and 5Sobha Windsor Phase 3 Wing 6, 7 and 8Sobha Windsor Phase 4 Wing 9, 10 and 11Sobha Windsor Phase 1 Wing 1 and 2Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2SOBHA AVALONSobha Brooklyn Towers - Town Park Phase 2, W2Sobha Brooklyn Towers - Town Park Phase 5, W3Sobha Royal CrestSOBHA WATER FRONTSOBHA MEADOWS WHISPERING HILLSobha Sentosa Phase 1 Wing 7Sobha Sentosa Phase 2 Wing 5 and 6Sobha Sentosa Phase 3 Wing 3 and 4Sobha Sentosa Phase 4 Wing 1 and 2Sobha Victoria park phase 1Sobha Victoria Park Phase 2Sobha InsigniaSobha Dream Gardens Phase 3 - Wing 3 and 4Sobha GaleraSobha Brooklyn Towers - Town Park Phase 1, W1Sobha Westhill Phase-I, II & IIISobha Neopolis Phase 1 - W 14, 15, 16, 17, 18 &19Sobha Neopolis Phase 3 - W 1, 2, 10 & 11Sobha Oakshire Phase 1 Wing 1,2,7 and 8Sobha Oakshire Phase 2 Wing 3,4,9 and 10Sobha Oakshire Phase 3 Wing 5,6,11 and 12Sobha Dream Gardens Phase 5 - Wing 10Sobha Dream Gardens Phase 4 - Wing 1 and 2Sobha Neopolis Phase 2 - W 12 & 13SOBHA ELYSIASobha Neopolis Phase 5 - W 5, 6 & 7Sobha Neopolis Phase 4 - 3, 4, 8 & 9SOBHA RIDGE WHISPERING HILLSOBHA Crystal Meadows Phase 1 Wing 1 to 6SOBHA Crystal Meadows Phase 2 Wing 7 and 8SOBHA Crystal Meadows Phase 3 Wing 9 to 15SOBHA Crystal Meadows Phase 4 Wing 23 to 28SOBHA Crystal Meadows Phase 5 Wing 16 to 22Sobha Brooklyn Towers - Town Park Phase 4, W4Sobha Brooklyn Towers - Town Park Phase 3, W5Sobha Infinia Phase 2A Block 5 Wing 5Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2Sobha AurumSobha Hamptons -Townpark Phase 1 W4 to 6Sobha Madison Heights-Townpark Phase 1 W5 to 7SOBHA Ayana at Dream Acres Wing 60 to 71SOBHA MAGNUSSOBHA InizioSOBHA WOODS WHISPERING HILLSOBHA ALTAIRSobha Madison Heights-Townpark Phase 2 W1 to 4ONE RESIDENCES AT SOBHA ONE WORLD Ph1 W1 and 2ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14SOBHA BOULEVARDONE RESIDENCES AT SOBHA ONE WORLD Ph2 W3 and 4ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11ONE RESIDENCES AT SOBHA ONE WORLD Ph3 W5 and 6ONE RESIDENCES AT SOBHA ONE WORLD Ph4 W7 and 8Sobha Hamptons -Townpark Phase 2 W1 to 3
Builder DNAthe whole portfolio, summed
16,609 homes · 253 plotson the public record across 146 projects
33,89,642 sq mbuilt-up filed
63,289 sq mplotted area
21,28,951 sq mland declared
₹32865.76 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
BBMP - Bruhat Bengaluru Mahanagara PalikeMunicipal / Corporation80 of 144 projects
BDA - Bangalore Development AuthorityUrban Development Authority17 of 144 projects
BMRDA - Bangalore Metropolitan Region Development AuthorityUrban Development Authority7 of 144 projects
Satellite Town Ring Road Planning AuthorityTown & Country Planning (DTCP)6 of 144 projects
Kochi Municipal CorporationMunicipal Corporation5 of 144 projects
Anekal Planning AuthorityTown & Country Planning (DTCP)4 of 144 projects
BIAPPA - Bangalore Airport Area Planning AuthorityUrban Development Authority3 of 144 projects
Pune Municipal CorporationMunicipal Corporation3 of 144 projects
Thiruvananthapuram Municipal CorporationMunicipal Corporationthis project3 of 144 projects
GIFT Urban Development AuthorityUrban Development Authority2 of 144 projects
Mysuru Urban Development AuthorityUrban Development Authority2 of 144 projects
Planning authority2 of 144 projects
Tripunithura MunicipalityMunicipality2 of 144 projects
Belagavi Urban Development AuthorityUrban Development Authority1 of 144 projects
CMDA (Chennai Metropolitan Development Authority)CMDA (Chennai Metropolitan Development Authority)1 of 144 projects
Local Planning AuthorityTown & Country Planning (DTCP)1 of 144 projects
Municipal CorporationMunicipal Corporation1 of 144 projects
Others1 of 144 projects
Peruvayal Grama PanchayatGrama Panchayat1 of 144 projects
Slum Rehabilitation AuthoritySlum Rehabilitation Authority1 of 144 projects
Town & Country Planning (DTCP)Town & Country Planning (DTCP)1 of 144 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from SOBHA LIMITED— the full portfolio →

03

Location

K-RERA · Registration filing
Street
ALATHARA
Village
CHERUVAKKAL
Taluk
THIRUVANANTHAPRUAM
District
Thiruvananthapuram
Pincode
695017
Survey no.
128/4,128/19
Patta no.
15925
What’s nearby
SchoolsNearest school 1.5km away · College or university 579m away · Library 1.6km away
HealthcareHospital 1.0km away · Clinic within 2km
LifestylePark 1.3km away · Gym or sports centre 1.7km away
ShoppingSupermarket 1.4km away
Getting around
Expressway 2.0 km · Salem - Kochi - Kanyakumari RoadPrimary road 1.8 kmRailway line 2.7 kmRailway station 2.8km away (Veli)Bus stop within 1km
Water & environment
Water body 194 m
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹8,278per sq yd
₹9,900per sq m
Which rate
Residential Plot with NH/PWD road access
Matched to
The value published for this project's own survey number, in “Cheruvaykal”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Thiruvananthapuram Municipal Corporation

Municipal Corporation
approved 30 Jun 2022 · 4 yrs ago
Building Permit no. UE2/22/2021Survey no. 128/4,128/19
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan UE2/22/2021 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Thiruvananthapuram Municipal Corporation

Municipal corporation / municipality

Has approved 224 RERA projectsabout 1 in 7 in Kerala, more than any other body in the state.

an apartments market91% apartments · 9% plotted layouts. Apartments like yours are this body's core business.

Builders
90
On record
12,045 flats · 635 plots
Since
2021

More apartment-heavy than Kerala overall — 91% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by K-RERA

07

Other projects nearby

The register · within 25 km

165 residential projects still under way within 25 km. Step out ring by ring:

Of the 191 projects the radar draws within 6 km — every kind, every stage — 81 are residential projects still under way. This list keeps only those, and looks further out.

3 projects within 1 km — showing the nearest 3.

CHERUVAKKALResidential (Apartment)

SOBHA RIDGE WHISPERING HILL

SOBHA LIMITED

Jan 2024registered
Dec 2029target completion
Government Guidance Rate₹8,278/sq ydScale110 flatsAuthorityK-RERA
CHERUVAKKALResidential (Apartment)

SOBHA WOODS WHISPERING HILL

SOBHA LIMITED

Jan 2026registered
May 2031target completion
Government Guidance Rate₹8,278/sq ydScale110 flatsAuthorityK-RERA
CHERUVAKKALResidential (Apartment)

PRS WINDY WOODS

PRS BUILD INDIA PRIVATE LIMITED

Feb 2024registered
Dec 2028target completion
Government Guidance Rate₹11,037/sq ydScale46 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.