In the proposed project, developer would construct Residential Apartment. The Maps were submitted to JDA for approval of the proposed Building having height 72.8 mtrs. and JDA issued the demand amounting to Rs. 8.80 Crores vide letter No. JDA/BPC(BP)/2014/D2934 dated 12.12.2014 for the complete proposed project, the same was deposited. However, as on date developer has got approval till 40Mtr height. Information and documents related to the project as per approval received from JDA are enclosed herewith. Approvals, if any, received in future shall be updated on RERA portal accordingly.
As per applicant request application for seeking extension in estimated finish date and further to the approval of hon'ble Chairman on dated 31.01.2020, estimated finish date has been changed from 31.01.2020 to 31.01.2021. Therefore now estimated finish date should be read as 31.01.2021.Estimated finished date updated on 31-01-2020. The Promoter shall obtain from the competent authority the requisite extension of validity of approved building plans and submit a copy thereof to the authority latest by 22.04.2020, failing which this certificate of extension shall stand withdrawn.
Timeline
Construction startFeb 2015
RERA registeredOct 2017
Proposed completionJan 2021
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
174 units across 9 batches
BuildingTypeArea sq mCount
IS Paradise3BHK+3T.10733
IS Paradise4BHK+4T.+SER.16211
IS ParadiseEWS-013248
IS Paradise4BHK+4T.+SER.16421
IS Paradise3BHK+3T.+SER.13243
IS ParadiseShowroom7891
IS Paradise4BHK + 4T.+SER.15411
IS ParadiseDUPLEX2845
IS Paradise3BHK+3T.+SER.1481
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools1 school within 1km · 3 educational institutions within 1km
HealthcareHospital 49m away · 7 clinics within 1km · Doctor's clinic within 1km
LifestylePark 2.0km away
ShoppingSupermarket 2.0km away · Mall 909m away · Convenience store within 500m
Getting around
Expressway 111 mPrimary road 2.4 kmRailway line 1.3 kmMetro station 832m away (Shyam Nagar)6 bus stops within 500m
Water & environment
Water body 1.1 km · Dravyavati River
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹187.37 Cr declared to build 174 flats. What that works out to:
₹1.08 Crdeclared cost per flatall-in — land + construction
₹2,622/sq ftof built-up area₹28,223/sq m
60%of the cost is land₹11,272/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 26 Oct 2017 · 8 yrs ago
The promised possession date (31 Jan 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
419 residential projects still under way within 25 km. Step out ring by ring:
Of the 371 projects the radar draws within 6 km — every kind, every stage — 123 are residential projects still under way. This list keeps only those, and looks further out.