6 × 5 BHK Units + Store (Ground to Fifth Floor, Basement Floor) · 5 × 4 BHK Unit + Store (Ground to Fourth Floor, Basement Floor) · 5 × 3 BHK Unit + Store (Ground to Fourth Floor, Basement Floor) · 1 × 3 BHK Unit with Open Terrace + Store (Fifth Floor, Basement Floor) · 1 × 4 BHK Unit with Open Terrace + Store (Fifth Floor, Basement Floor)
Carpet area
117–194 sq mper-type range, as filed
Land area
876 sq m
Description
1.) There are total 18 residential units which shall be sold along with 18 stores. 2.) At the time of registration, address of project was wrongly mentioned as Plot no. B-186-B instead of D-186 B. Further all declarations, undertakings, agreements and other documents executed with Plot no. B-186-B to be considered as D-186 B.
Timeline
Construction startJul 2023
RERA registeredOct 2023
Proposed completionJun 2025
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
18 units across 5 batches
BuildingTypeArea sq mCount
TIRUPATI OZONE4 BHK Unit + Store (Ground to Fourth Floor, Basement Floor)1525
TIRUPATI OZONE5 BHK Units + Store (Ground to Fifth Floor, Basement Floor)1946
TIRUPATI OZONE3 BHK Unit with Open Terrace + Store (Fifth Floor, Basement Floor)1171
TIRUPATI OZONE3 BHK Unit + Store (Ground to Fourth Floor, Basement Floor)1175
TIRUPATI OZONE4 BHK Unit with Open Terrace + Store (Fifth Floor, Basement Floor)1521
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools2 schools within 500m · 6 educational institutions within 1km · College or university 1.8km away
HealthcareHospital 320m away · 5 clinics within 1km · Pharmacy within 500m
LifestylePark 728m away · 61+ restaurants and cafes within 1km
ShoppingSupermarket 751m away · Mall 886m away · Convenience store within 1km
Getting around
Expressway 866 m · Church roadPrimary road 386 m · Sawai Jai Singh CircleRailway line 1.2 kmMetro station 429m away (Sindhi Camp)5 bus stops within 500m
Water & environment
Water body 695 m · nurse ka chok
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹8.00 Cr declared to build 18 flats. What that works out to:
₹44.44 Lakhdeclared cost per flatall-in — land + construction
₹1,773/sq ftof built-up area₹19,088/sq m
50%of the cost is land₹4,243/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹34,281per sq yd
₹41,000per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “Banipark”.
Highest rate
₹66,890 per sq yd — the top road-facing rate among the 47 residential rates published for this village
By the road it faces
interior plot
₹41,000 / sq m
₹34,281 / sq yd
road-facing
₹50,000 / sq m
₹41,806 / sq yd
41–60 ft road
₹55,000 / sq m
₹45,987 / sq yd
61–99 ft road
₹66,700 / sq m
₹55,770 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 13 Oct 2023 · 2 yrs ago
The promised possession date (30 Jun 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
417 residential projects still under way within 25 km. Step out ring by ring:
Of the 196 projects the radar draws within 6 km — every kind, every stage — 69 are residential projects still under way. This list keeps only those, and looks further out.