Complete project overview

RAJ-RERA · Registration filing
Units
12 units
Mix
1 × FIRST FLOOR FLAT NO. 101 · 1 × SECOND FLOOR FLAT NO. 201 · 1 × SECOND FLOOR FLAT NO. 202 · 1 × SECOND FLOOR FLAT NO. 203 · 1 × THIRD FLOOR FLAT NO. 301 · 1 × THIRD FLOOR FLAT NO. 302
Carpet area
91–280 sq mper-type range, as filed
Land area
580 sq m

Timeline

Construction startDec 2022
RERA registeredAug 2023
Proposed completionDec 2024
TodayJul 2026

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

12 units across 12 batches
BuildingTypeArea sq mCount
DESIGN CORE PRIMEFIRST FLOOR FLAT NO. 1012801
DESIGN CORE PRIMESECOND FLOOR FLAT NO. 201911
DESIGN CORE PRIMESECOND FLOOR FLAT NO. 202941
DESIGN CORE PRIMESECOND FLOOR FLAT NO. 203931
DESIGN CORE PRIMETHIRD FLOOR FLAT NO. 301911
DESIGN CORE PRIMETHIRD FLOOR FLAT NO. 302941
DESIGN CORE PRIMEFOURTH FLOOR FLAT NO. 401931
DESIGN CORE PRIMEFOURTH FLOOR FLAT NO. 402911
DESIGN CORE PRIMEFIFTH FLOOR FLAT NO. 501911
DESIGN CORE PRIMEFIFTH FLOOR FLAT NO. 5021881
DESIGN CORE PRIMEFOURTH FLOOR FLAT NO. 403941
DESIGN CORE PRIMETHIRD FLOOR FLAT NO. 303931

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RAJ-RERA · Promoter registration

DESIGN CORE PRIME

OrganisationPromoter type
Jaipur, RajasthanBased in
1Projects
1City
2023–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RAJ-RERA · Registration filing
Address
1-B, MISSION COMPOUND, HARTHROY, Jaipur, Jaipur, 302001
Village
HARTHROY
Taluka
Jaipur
District
Jaipur
Pincode
302001
What’s nearby
Schools1 school within 1km · College or university 1.6km away · Library 1.8km away
HealthcareHospital 385m away · 5 clinics within 1km · Pharmacy within 1km
Lifestyle1 park within 500m · 59+ restaurants and cafes within 1km · Swimming pool within 2km
ShoppingSupermarket 823m away · Mall 1.6km away · Convenience store within 1km
Getting around
Expressway 127 m · Acharya Shri Tulsi SetuPrimary road 763 mRailway line 208 mMetro station 570m away (Railway Station)4 bus stops within 500m
Water & environment
Canal 908 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹5.50 Cr declared to build 12 flats. What that works out to:

₹45.83 Lakhdeclared cost per flatall-in — land + construction
₹2,236/sq ftof built-up area₹24,064/sq m
35%of the cost is land₹3,045/sq ft of land

This is what the promoter filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Planning authority

RAJ-RERA · Approved building plan
Building Permitapproved 3 Aug 2023 · 2 yrs ago

The promised possession date (12 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RAJ-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RAJ-RERA does not publish a complaints register. This read cannot speak to them either way.