HORIZON
Share

ANUSHA BASANTI KUNJ

BRERAP00206-1/95/R-79/2018 · RERA Bihar · https://gethorizon.in/projects/anusha-basanti-kunj-patna-sadar-f855thh5

01

Complete project overview

RERA Bihar · Registration filing
Project name
ANUSHA BASANTI KUNJ
Units
15 units
Unit mix
15 × 3 BHK
Parking
15 spaces
Land area
767 sq m
Built-up area
1,531 sq m

Timeline

Project startedSep 2017
RERA registeredJul 2018
Proposed completionMar 2022
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

15 units across 1 batch
BuildingTypeArea sq mCount
Anush Basanti kunj3 BHK31115

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

SAVITA BUILDWELL PVT LTD

CompanyPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
1Projects
1Cities
2018–2022Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
Anchal (block)
Patna Sadar
Mauja (revenue village)
Mainpur
Address
North s. k. puri off Boring Road
What’s nearby
Schools1 school within 500m · 5 educational institutions within 1km · College or university 1.1km away
HealthcareHospital 215m away · 11 clinics within 1km · Pharmacy within 500m
LifestylePark 1.7km away · Gym or sports centre 181m away · 19+ restaurants and cafes within 1km
ShoppingNo supermarket within 2km · Mall 588m away · Convenience store within 500m
Getting around
Expressway 815 mPrimary road 538 m · Atal Path FlyoverRailway line 2.2 kmRailway station 2.4km away (Sachiwalaya)Limited bus connectivity nearby
Water & environment
River 192 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹7.30 Cr declared to build 15 flats. What that works out to:

₹48.67 Lakhdeclared cost per flatall-in — land + construction
₹4,430/sq ftof built-up area₹47,683/sq m
52%of the cost is land₹4,600/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹33,574per sq yd
₹40,155per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Mainpura”.
Highest rate
₹37,707 per sq yd — the top road-facing rate among the residential rates published for this village

By the road it faces

Res. Branch Road₹40,155 / sq m₹33,575 / sq yd
Res. Main Road₹45,097 / sq m₹37,707 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (15 Mar 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

359 residential projects still under way within 25 km. Step out ring by ring:

Of the 581 projects the radar draws within 6 km — every kind, every stage — 135 are residential projects still under way. This list keeps only those, and looks further out.

10 projects within 1 km — showing the nearest 6.

Patna SadarResidential/Group Housing

LOTUS TOWER

JEEVAN ENGICON PRIVATE LIMITED

Mar 2025registered
Sep 2029target completion
Declared cost₹22.25 CrScale14 flatsAuthorityRERA Bihar
North Sri Krishna PuriResidential/Group Housing

SHIV SAVITRI SADAN

PLATINUM HERITAGE HOMES PVT. LTD.

May 2025registered
Aug 2029target completion
Declared cost₹8.92 CrScale14 flatsAuthorityRERA Bihar
BORING CANAL ROADResidential/Group Housing

KAMLA BINAY APARTMENT

CHANDRA SALES PVT. LTD.

Aug 2025registered
Sep 2029target completion
Declared cost₹13.67 CrScale5,978 flatsAuthorityRERA Bihar
East Boring canal roadResidential/Group Housing

RADHE KRISHNA ENCLAVE

RUDRA INFRACITY PRIVATE LIMITED

Jun 2026registered
Dec 2028target completion
Declared cost₹9.56 CrAuthorityRERA Bihar
Patna SadarResidential/Group Housing

GLAMCO S SINHA SADAN

GLAMCO EXIM PRIVATE LIMITED

Jun 2025registered
Dec 2029target completion
Declared cost₹5.00 CrScale10 flatsAuthorityRERA Bihar
Patna SadarResidential/Group Housing

SHREE GANESH SANDHYA ALPNA ENCLAVE

ORB DEVELOPER PRIVATE LIMITED

Jul 2026registered
Sep 2031target completion
Declared cost₹3.55 CrAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.