HORIZON
Share

LOTUS TOWER

BRERAP181328040325180929E00 · RERA Bihar · https://gethorizon.in/projects/lotus-tower-patna-sadar-s3y6mi0o

01

Complete project overview

RERA Bihar · Registration filing
Project name
LOTUS TOWER
Units
14 units
Unit mix
14 × 3 BHK
Parking
19 spaces
Land area
975 sq m
Built-up area
1,947 sq m

Timeline

Project startedSep 2024
RERA registeredMar 2025
Proposed completionSep 2029
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

14 units across 5 batches
BuildingTypeArea sq mCount
LOTUS TOWER3 BHK4273
LOTUS TOWER3 BHK4013
LOTUS TOWER3 BHK4353
LOTUS TOWER3 BHK4313
LOTUS TOWER3 BHK02

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

JEEVAN ENGICON PRIVATE LIMITED

CompanyPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
1Projects
1City
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
City / town
PATNA
Anchal (block)
Patna Sadar
Mauja (revenue village)
Dujara
Address
PLOT NO.-1178 P, 1179 P, KHATA NO.-11, TAUZI NO.-5090, THANA NO.-04, WARD NO.-23, CIRCLE NO.-249, THANA- SRI KRISHNA NAGAR, MAUZA- DUJRA, DISTRICT- PATNA, BIHAR
What’s nearby
Schools1 school within 500m · 5 educational institutions within 1km · College or university 805m away
HealthcareHospital 226m away · 12 clinics within 1km · Pharmacy within 500m
LifestylePark 1.3km away · Gym or sports centre 315m away · 23+ restaurants and cafes within 1km
ShoppingNo supermarket within 2km · Mall 475m away · Convenience store within 1km
Getting around
Expressway 741 mPrimary road 795 m · Atal Path FlyoverRailway line 2.0 kmRailway station 2.3km away (Sachiwalaya)Limited bus connectivity nearby
Water & environment
River 309 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹22.25 Cr declared to build 14 flats. What that works out to:

₹1.59 Crdeclared cost per flatall-in — land + construction
₹10,618/sq ftof built-up area₹1,14,291/sq m
72%of the cost is land₹15,250/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹33,574per sq yd
₹40,155per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Dujra”.
Highest rate
₹37,707 per sq yd — the top road-facing rate among the residential rates published for this village

By the road it faces

Res. Branch Road₹40,155 / sq m₹33,575 / sq yd
Res. Main Road₹45,097 / sq m₹37,707 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan

PATNA MUNICIPAL CORPORATION

Municipal / Corporation
Building Permit
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

See every project approved by RERA Bihar

07

Other projects nearby

The register · within 25 km

358 residential projects still under way within 25 km. Step out ring by ring:

Of the 528 projects the radar draws within 6 km — every kind, every stage — 119 are residential projects still under way. This list keeps only those, and looks further out.

5 projects within 1 km — showing the nearest 5.

390 m awayResidential/Group Housing

KAMLA BINAY APARTMENT

CHANDRA SALES PVT. LTD. · BORING CANAL ROAD · PATNA

Aug 2025registered
Sep 2029target completion
Declared cost₹13.67 CrScale5,978 flatsAuthorityRERA Bihar
410 m awayResidential/Group Housing

RADHE KRISHNA ENCLAVE

RUDRA INFRACITY PRIVATE LIMITED · East Boring canal road · PATNA

Jun 2026registered
Dec 2028target completion
Declared cost₹9.56 CrAuthorityRERA Bihar
440 m awayResidential/Group Housing

SHIV SAVITRI SADAN

PLATINUM HERITAGE HOMES PVT. LTD. · North Sri Krishna Puri · Patna

May 2025registered
Aug 2029target completion
Declared cost₹8.92 CrScale14 flatsAuthorityRERA Bihar
520 m awayResidential/Group Housing

PINK VATIKA HOMES

PINK VATIKA HOMES PRIVATE LIMITED · Patna Sadar · PATNA

Jun 2024registered
Sep 2028target completion
Declared cost₹6.74 CrScale13 flatsAuthorityRERA Bihar
600 m awayResidential/Group Housing

SAROJINI ANIL ENCLAVE

SRIGOBINDA CONSTRUCTION PRIVATE LIMITED · Patna Sadar · PATNA

Jan 2026registered
May 2028target completion
Declared cost₹6.01 CrScale14 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.