The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
ORERA · Registration filing
District
Khordha
Pincode
751003
What’s nearby
Schools2 schools within 1km · 3 educational institutions within 1km · College or university 917m away
HealthcareHospital 1.2km away · Clinic within 2km
LifestyleNo parks within 2km · Gym or sports centre 1.5km away
ShoppingSupermarket 1.8km away · ATM within 500m
Getting around
Expressway 1.2 km · FlyoverPrimary road 1.1 km · Raj Bhavan SquareRailway line 3.2 km · Howrah - Chennai Main LineRailway station 3.3km away (Bhubaneswar)Bus stop within 500m
Land, title & encumbrance
Land parcels2 parcels · 697 sq m total
VillageGHATIKIA
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Location — done
04
Government Guidance Rate
Odisha IGR — benchmark valuation
In Odisha it’s called the benchmark value.
₹19,542per sq yd
₹23,372per sq m
Which rate
residential
Matched to
The rate published for the village of “GHATIKIA”.
What this number is — and isn’t
The minimum value Odisha’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
ORERA · Approved building plan
Bhubaneswar Municipal Corporation
Municipal / Corporation
Building Permit
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Bhubaneswar Municipal Corporation
Municipal / Urban Local Body
Has approved 371 RERA projects — about 1 in 3 in Odisha, more than any other body in the state.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
229
On record
22,701 flats · 11 plots
Reach
35 pincodes
Since
2019
More apartment-heavy than Odisha overall — 99% apartments here vs 87% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. ORERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to ORERA
Litigation
None declared in this filing
Only what the builder declared, or what ORERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with ORERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
370 residential projects still under way within 25 km. Step out ring by ring:
Of the 642 projects the radar draws within 6 km — every kind, every stage — 268 are residential projects still under way. This list keeps only those, and looks further out.