9 filed — Water Supply, Emergency Evacuation Services, Use of Renewable Energy, Elevators, Community Center, Plantation Area/No. …
Description
(Residential Project, S+5, No. of Units- 10)
Timeline
Construction startNov 2022
Proposed completionJan 2025
TodaySep 2026
Find your flat
Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.
UnitCarpet sq m
1011ST FLOOR103.30
1021ST FLOOR102.90
2012ND FLOOR103.30
2022ND FLOOR102.90
3013RD FLOOR103.30
3023RD FLOOR102.90
4014TH FLOOR103.30
4024TH FLOOR102.90
5015TH FLOOR103.30
5025TH FLOOR88.98
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes.
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools1 school within 1km · College or university 1.1km away
HealthcareHospital 619m away · 3 clinics within 1km
LifestyleNo parks within 2km · Gym or sports centre 754m away · 3 restaurants and cafes within 1km
ShoppingSupermarket 1.4km away · Bank 381m away · ATM within 500m
Getting around
Expressway 2.1 kmPrimary road 604 m · Bidyut MargRailway line 1.7 kmRailway station 1.7km away (Bhubaneswar)Bus stop within 1km
Land, title & encumbrance
Land parcels1 parcel · 502 sq m total
Land tenure1 of 1 parcel held under a Power of Attorney / development agreement — not a registered sale deed to the promoter
VillageGHATIKIA
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Location — done
04
Government Guidance Rate
Odisha IGR — benchmark valuation
In Odisha it’s called the benchmark value.
₹19,542per sq yd
₹23,372per sq m
Which rate
residential
Matched to
The rate published for the village of “GHATIKIA”.
What this number is — and isn’t
The minimum value Odisha’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
ORERA · Approved building plan
Bhubaneswar Municipal Corporation
Municipal / Corporation
Building Permit
The promised possession date (22 Jan 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Bhubaneswar Municipal Corporation
Municipal / Urban Local Body
Has approved 371 RERA projects — about 1 in 3 in Odisha, more than any other body in the state.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
229
On record
22,701 flats · 11 plots
Reach
35 pincodes
Since
2019
More apartment-heavy than Odisha overall — 99% apartments here vs 87% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. ORERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to ORERA
Litigation
None declared in this filing
Only what the builder declared, or what ORERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with ORERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
370 residential projects still under way within 25 km. Step out ring by ring:
Of the 629 projects the radar draws within 6 km — every kind, every stage — 270 are residential projects still under way. This list keeps only those, and looks further out.
7 projects within 1 km — showing the nearest 6.
10 m awayResidential
LOTUS CRYSTAL
KAPIS REALTY DEVELOPERS PVT LTD · Khordha
PossessionMar 2028Scale30 flatsRegistrationvalid to Dec 2026