Registration for Group Development comprising of 3 Blocks with combined extended double basement floor (meant for parking)+ Combined Stilt Floor (Meant for Parking & Block-1 Shop) consisting of Block-1: 1st & 2nd Floor Shop with 4 dwelling units & 3rd to 16th Floor with 42 dwelling units; Block - 2: 1st Floor Club House & 8 Dwelling Units + 2nd to 16 Floors with 195 Dwelling Units Block - 3: 1st to 16 Floors with 239 Dwelling Units (Totally 488 Dwelling Units) at comprised in S.Nos.21/3, 23/1B2C, 2B2, 25/2A and 67 (as per Document) and S.Nos.21/3A, 23/1B2C, 2B2, 25/2A1 and 67 (as per Patta) of Nerkundram village, Maduravoyal Taluk, Chennai District.
16 projectson the public record across 16 projects
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 764m away · Clinic within 2km · Pharmacy within 1km
LifestyleNo parks within 2km · Gym or sports centre 86m away
ShoppingSupermarket 1.5km away · Bank 324m away
Getting around
Expressway 2.8 kmPrimary road 111 m · EVR Periyar SalaiRailway line 3.4 kmMetro station 922m away (Koyambedu)Bus stop within 500m
Water & environment
River 908 m · Cooum
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Tamil Nadu registration department
In Tamil Nadu it’s called the guideline value.
No government guidance rate is shown for this project.
Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
TNRERA · Approved building plan
CMDA (Chennai Metropolitan Development Authority)
CMDA (Chennai Metropolitan Development Authority)
approved 10 Mar 2026 · 6 mo ago
Planning Permission no. OL-PP/HRB/0035/2025
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan OL-PP/HRB/0035/2025 on the approving authority’s portal to confirm the approval.
The approving body, at scale
CMDA (Chennai Metropolitan Development Authority)
Metropolitan development authority
Has approved 1,914 RERA projects — about 1 in 2 in Tamil Nadu, more than any other body in the state.
Builders
1,310
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. TNRERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to TNRERA
Litigation
None declared in this filing
Only what the builder declared, or what TNRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with TNRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
450 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
Of the 153 projects the radar draws within 6 km — every kind, every stage — 114 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.