(1). 12.5% of the total saleable plots has been mortgaged by the Urban Improvement Trust, Sikar against the internal development work of the project those plots are plot no. 26 to 30 ad measuring 808.23 Sq. Mtr. (2). Open Area of the project is 2704.90 sq.mtr. and the same is calculated by considering road area as 2704.90 sq.mtr.
Timeline
Construction startMar 2024
RERA registeredJun 2024
Proposed completionJul 2025
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
47 plots across 26 batches
TypeArea sq mCount
Plot1231
Plot1361
Plot1461
Plot1411
Plot1531
Plot1601
Plot1691
Plot2041
Plot1831
Plot1396
Plot1351
Plot1632
Plot1678
Plot2321
Plot1321
Plot1391
Plot1674
Plot1511
Plot1111
Plot326
Plot791
Plot941
Plot1121
Plot1131
Plot1131
Plot941
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools1 school within 500m · 8 educational institutions within 1km · College or university 1.5km away
HealthcareHospital 374m away · 1 clinic within 1km
Lifestyle1 park within 500m · Gym or sports centre 429m away · 22+ restaurants and cafes within 1km
ShoppingSupermarket 301m away · Mall 603m away · Convenience store within 500m
Getting around
Primary road 259 m · Jaipur-Jhunjhunu Bypass RoadRailway line 2.5 kmRailway station 2.8km away (Sikar Railway Station)Limited bus connectivity nearby
Price analysisdeclared build cost — not a sale price
₹83.00 Lakh declared to build 47 plots. What that works out to:
₹1.77 Lakhdeclared cost per plotall-in — land + construction
₹86/sq ftof plotted area₹923/sq m
34%of the cost is land₹29/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates (rural branch)
In Rajasthan it’s called the DLC rate.
₹2,341per sq yd
₹2,800per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “Ghorana”.
Spread
₹2,341 – ₹5,100 per sq yd across the places it was taken over
This filing declares ₹923 per sq m of plotted area — 0.33× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Urban Improvement Trust
Urban Improvement Trust
Layout Permitapproved 28 Jun 2024 · 2 yrs ago
The promised possession date (31 Jul 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Urban Improvement Trust
A city-level Urban Improvement Trust — Rajasthan's town-development body in cities without a development authority. It has approved 612 RERA projects across 20 districts — about 1 in 4 in Rajasthan.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
69 plotted projects still under way within 25 km. Step out ring by ring:
Of the 153 projects the radar draws within 6 km — every kind, every stage — 32 are plotted projects still under way. This list keeps only those, and looks further out.