Beneath The Wandering Leaf
CASADEL HOMES PRIVATE LIMITED · MARADU
PRESTIGE PANORAMA
Timeline
9% overall, as filed
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
More from THOMSUN REALTORS PRIVATE LIMITED— the full portfolio →
In Kerala it’s called the fair value.
What this number is — and isn’t
The promised possession date (30 Jun 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan E/1/BA/A3/2396/2011 on the approving authority’s portal to confirm the approval.
Has approved 21 RERA projects — 1.4% of Kerala.
an apartments market — 95% apartments · 5% plotted layouts. Apartments like yours are this body's core business.
More apartment-heavy than Kerala overall — 95% apartments here vs 81% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
2 complaints · 0 disposed · 1 open · 1 with no clear status
| Number | Forum | Date | Status | |
|---|---|---|---|---|
| 35/2025 | K-RERA Adjudicating | 2025 | not stated | |
| 164/2025 | K-RERA Authority | 2025 | Hearingopen |
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
187 residential projects still under way within 25 km. Step out ring by ring:
Of the 220 projects the radar draws within 6 km — every kind, every stage — 86 are residential projects still under way. This list keeps only those, and looks further out.
3 projects within 1 km — showing the nearest 3.
CASADEL HOMES PRIVATE LIMITED · MARADU
Sobha Limited · NADAMA
Sobha Limited · NADAMA
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you