01

Complete project overview

K-RERA · Registration filing
Units
32 units
Mix
16 × 2BHK · 16 × 3BHK
Buildings
1
Land area
1,587 sq m
Floor area
5,032 sq m
Description
ARYA BHANGY RHINESTONE

Timeline

Project startedAug 2019
RERA registeredMay 2021
Proposed completionJun 2024
TodaySep 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

32 of 32 available
TypeArea sq mAvailable
2BHK7716 of 16
3BHK12016 of 16

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

ARYA BHANGY BUILDERS PVT LTD

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
2Projects
1Cities
2021–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
64 homeson the public record across 2 projects
13,241 sq mbuilt-up filed
3,589 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from ARYA BHANGY BUILDERS PVT LTD— the full portfolio →

03

Location

K-RERA · Registration filing
Street
THOUNDAYIL LANE
Village
ERNAKULAM
Taluk
Kanayannur
District
Ernakulam
Pincode
682036
Survey no.
2372/1,2,4,5, 936/3
Patta no.
20563,20299,22019
What’s nearby
Schools2 schools within 1km · 12 educational institutions within 1km · College or university 1.0km away
HealthcareHospital 487m away · 22 clinics within 1km · Pharmacy within 500m
LifestylePark 1.4km away · Gym or sports centre 201m away · 162+ restaurants and cafes within 1km
ShoppingSupermarket 203m away · Convenience store within 500m · Bank 227m away
Getting around
Expressway 2.7 km · Salem - Kochi - Kanyakumari RoadPrimary road 313 m · Sahodaran Ayyappan RoadRailway line 137 mMetro station 653m away (Kadavanthra)2 bus stops within 500mAirport 2.9km away
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹26,422per sq yd
₹31,601per sq m
Which rate
Residential Plot with Corp./Mun./Panch. road access
Matched to
The value published for this project's own survey number, in “Ernakulam”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Kochi Municipal Corporation

Municipal Corporation
approved 5 Jul 2019 · 7 yrs ago
Building Permit no. KRP1/388/14/COC/KRP/1020/14Survey no. 2372/1,2,4,5, 936/3

The promised possession date (30 Jun 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan KRP1/388/14/COC/KRP/1020/14 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Kochi Municipal Corporation

Municipal corporation / municipality

Has approved 92 RERA projectsabout 1 in 17 in Kerala.

an apartments market97% apartments · 3% plotted layouts. Apartments like yours are this body's core business.

Builders
50
On record
4,090 flats · 12 plots
Since
2021

More apartment-heavy than Kerala overall — 97% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by K-RERA

07

Other projects nearby

The register · within 25 km

186 residential projects still under way within 25 km. Step out ring by ring:

Of the 192 projects the radar draws within 6 km — every kind, every stage — 74 are residential projects still under way. This list keeps only those, and looks further out.

4 projects within 1 km — showing the nearest 4.

ERNAKULAMMixed (Commercial & Residential)

GREHA GOLDEN SAPPHIRE

GREHA HOMES PVT LTD

Aug 2023registered
Jun 2026target completion
Government Guidance Rate₹79,267/sq ydScale16 flatsAuthorityK-RERA
ERNAKULAMResidential (Apartment)

NOEL SENTRUM

NOEL VILLAS AND APARTMENTS

Nov 2023registered
Jun 2027target completion
Government Guidance Rate₹70,459/sq ydScale44 flatsAuthorityK-RERA
ERNAKULAMMixed (Commercial & Residential)

MARITIME PRIME

MARITIME BUILDERS PRIVATE LIMITED

Sep 2024registered
Nov 2026target completion
Government Guidance Rate₹44,037/sq ydScale17 flatsAuthorityK-RERA
ERNAKULAMResidential (Apartment)

AC MANUELS

AC CITY PROJECTS PVT LTD

Sep 2024registered
Mar 2028target completion
Government Guidance Rate₹30,826/sq ydScale21 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.