T1/OL/120/2023 · K-RERA · https://gethorizon.in/projects/tulips-elamkulam-ernakulam-slnhwc39

01

Complete project overview

K-RERA · Registration filing
Units
9 units
Mix
6 × 2BHK · 3 × 3BHK
Buildings
1
Land area
475 sq m
Floor area
1,098 sq m
Description
TULIPS

Timeline

Project startedJun 2023
RERA registeredSep 2023
Proposed completionDec 2025
TodaySep 2026
Construction progress

86% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

9 of 9 available
TypeArea sq mAvailable
2BHK573 of 3
2BHK623 of 3
3BHK733 of 3

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

K Y HOMES

Limited Liability PartnershipPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
1Projects
1Cities
2023–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Vyloppilly Bye Lane 1, Azad Road
Village
ELAMKULAM
Taluk
Kanayannur
District
Ernakulam
Pincode
682017
Survey no.
145/2/37 145/2/37/2
Patta no.
39697
What’s nearby
SchoolsNearest school 1.1km away · College or university 1.7km away · Library 1.0km away
HealthcareHospital 257m away · 1 clinic within 1km · Pharmacy within 1km
LifestylePark 1.7km away · Gym or sports centre 1.1km away · 19+ restaurants and cafes within 1km
ShoppingSupermarket 255m away · Mall 837m away · Convenience store within 500m
Getting around
Expressway 2.0 kmPrimary road 765 mRailway line 1.0 kmMetro station 759m away (Kaloor)6 bus stops within 500m
Water & environment
Canal 479 mWater body 986 m · Thevara-Perandoor Canal
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹22,038per sq yd
₹26,358per sq m
Which rate
Residential Plot with Corp./Mun./Panch. road access
Matched to
The value published for this project's own survey number, in “Elamkulam”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Kochi Municipal Corporation

Municipal Corporation
approved 5 Apr 2023 · 3 yrs ago
Building Permit no. ISO/MOP/COC/39620/2022Survey no. 145/2/37 145/2/37/2

The promised possession date (30 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan ISO/MOP/COC/39620/2022 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Kochi Municipal Corporation

Municipal corporation / municipality

Has approved 92 RERA projectsabout 1 in 17 in Kerala.

an apartments market97% apartments · 3% plotted layouts. Apartments like yours are this body's core business.

Builders
50
On record
4,090 flats · 12 plots
Since
2021

More apartment-heavy than Kerala overall — 97% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by K-RERA

07

Other projects nearby

The register · within 25 km

188 residential projects still under way within 25 km. Step out ring by ring:

Of the 231 projects the radar draws within 6 km — every kind, every stage — 92 are residential projects still under way. This list keeps only those, and looks further out.

4 projects within 1 km — showing the nearest 4.

POONITHURAResidential (Apartment)

PIMENTO GARDEN

Synthite Industries Pvt Ltd

May 2023registered
Apr 2027target completion
Government Guidance Rate₹15,893/sq ydScale26 flatsAuthorityK-RERA
POONITHURAResidential (Apartment)

ABAD MAGNIFICENT

ABAD BUILDERS PVT LTD

Apr 2024registered
Sep 2028target completion
Government Guidance Rate₹15,893/sq ydScale32 flatsAuthorityK-RERA
POONITHURAResidential (Apartment)

CH Vaikund

Akshay S Kamath

Mar 2024registered
Apr 2026target completion
Government Guidance Rate₹11,920/sq ydScale20 flatsAuthorityK-RERA
POONITHURAResidential (Apartment)

CH Bhuvi

Chandrus Housing Projects Private Limited

Apr 2026registered
Sep 2028target completion
Government Guidance Rate₹7,947/sq ydScale16 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.