HORIZON
Share

SUN SQUARE

BRERAP23443-1/22/R-1349/2022 · RERA Bihar · https://gethorizon.in/projects/sun-square-lohanipur-patna-6hbzu2e4

01

Complete project overview

RERA Bihar · Registration filing
Project name
SUN SQUARE
Units
39 units
Unit mix
23 × 4 BHK · 12 × Shop · 3 × 3 BHK · 1 × AUDI
Parking
121 spaces
Land area
3,685 sq m
Built-up area
9,185 sq m

Timeline

Project startedJan 2022
RERA registeredApr 2022
Proposed completionJun 2025
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

39 units across 5 batches
BuildingTypeArea sq mCount
SUN SQUARE4 BHK21412
SUN SQUARE4 BHK011
SUN SQUAREShop012
SUN SQUARE3 BHK03
SUN SQUAREAUDI3511

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

CRATUS PARAAK INFRA LLP

Limited Liability PartnershipPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
1Projects
1Cities
2022–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
Anchal (block)
Patna Sadar
Mauja (revenue village)
Lohanipur
Village
LOHANIPUR
Address
KANKERBAGH MAIN ROAD
What’s nearby
Schools1 school within 500m · 7 educational institutions within 1km · College or university 170m away
HealthcareHospital 140m away · 15 clinics within 1km · Doctor's clinic within 1km
LifestylePark 825m away · Gym or sports centre 757m away · 6 restaurants and cafes within 1km
ShoppingSupermarket 630m away · Mall 768m away · Bank 303m away
Getting around
Expressway 14 m · Kumhrar RoadPrimary road 1.8 km · Ashok Raj PathRailway line 205 mRailway station 141m away (Rajendra Nagar Terminal (Patna))Limited bus connectivity nearby
Water & environment
Water body 945 mCanal 1.0 km · jogipur canal
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹51.19 Cr declared to build 39 flats. What that works out to:

₹1.31 Crdeclared cost per flatall-in — land + construction
₹5,178/sq ftof built-up area₹55,735/sq m
11%of the cost is land₹1,473/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹21,178per sq yd
₹25,328per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Lohanipur”.
Highest rate
₹24,793 per sq yd — the top road-facing rate among the residential rates published for this village

By the road it faces

Res. Branch Road₹25,328 / sq m₹21,177 / sq yd
Res. Main Road₹29,653 / sq m₹24,794 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan

PRDA

Building Permit

The promised possession date (20 Jun 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

359 residential projects still under way within 25 km. Step out ring by ring:

Of the 311 projects the radar draws within 6 km — every kind, every stage — 66 are residential projects still under way. This list keeps only those, and looks further out.

4 projects within 1 km — showing the nearest 4.

Patna SadarResidential/Group Housing

APOGEE TOWER

APOGEE PROPERTY INDIA PRIVATE LIMITED

Aug 2024registered
Dec 2028target completion
Declared cost₹3.86 CrScale16 flatsAuthorityRERA Bihar
Patna SadarMixed Development(residential and commercial)

ROYAL ONKAR APARTMENT

ROYAL PREMIUM DEVELOPERS

May 2025registered
Mar 2030target completion
Declared cost₹11.01 CrScale29 flatsAuthorityRERA Bihar
Patna SadarResidential/Group Housing

RAJ TOWER

RAJ CONSTRUCTION

Dec 2021registered
Oct 2026target completion
Declared cost₹28.63 CrScale189 flatsAuthorityRERA Bihar
PatnaResidential

SHIV SHYAM ORCHARD

APNA AWAS CONSTRUCTION PVT.LTD.

Nov 2023registered
Jul 2028target completion
Declared cost₹9.44 CrAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.