Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
20 units across 8 batches
BuildingTypeArea sq mCount
RADHIKA REGENCY3 BHK02
RADHIKA REGENCY3 BHK2623
RADHIKA REGENCY3 BHK2503
RADHIKA REGENCY2 BHK1134
RADHIKA REGENCY2 BHK1593
RADHIKA REGENCY2 BHK1913
RADHIKA REGENCY2 BHK4531
RADHIKA REGENCY2 BHK01
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
RERA Bihar · Registration filing
District
Patna
City / town
PATNA
Anchal (block)
Phulwari Sarif
Mauja (revenue village)
Jaganpur
Village
BHUPATIPUR
Address
NEAR MITHAPUR BUS STAND,MOHALLA-RAMKRISHNA NAGAR,P.O-DHELWAN,P.S-RAMKRISHNA NAGAR
What’s nearby
Schools1 school within 500m · 3 educational institutions within 1km · College or university 1.1km away
HealthcareHospital 289m away · 10 clinics within 1km · Pharmacy within 1km
Lifestyle1 park within 500m · Gym or sports centre 1.7km away
Expressway 1.1 km · Kumhrar RoadPrimary road 763 m · Ashok Raj PathRailway line 1.0 km · Howrah - Delhi RailwayRailway station 1.1km away (Rajendra Nagar Terminal (Patna))Bus stop within 1km
Water & environment
Canal 748 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹3.56 Cr declared to build 20 flats. What that works out to:
₹17.80 Lakhdeclared cost per flatall-in — land + construction
₹2,547/sq ftof built-up area₹27,420/sq m
44%of the cost is land₹2,106/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Bihar Registration — Minimum Value Register
In Bihar it’s called the MVR (minimum value register) rate.
₹19,008per sq yd
₹22,734per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Jaganpura”.
Highest rate
₹22,211 per sq yd — the top road-facing rate among the residential rates published for this village
By the road it faces
Res. Branch Road
₹22,734 / sq m
₹19,009 / sq yd
Res. Main Road
₹26,564 / sq m
₹22,211 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.
What this number is — and isn’t
The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Bihar · Approved building plan
Building Permit
The promised possession date (10 Apr 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RERA Bihar · public record
Complaints register
Not published. RERA Bihar doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Bihar
Litigation
None declared in this filing
Only what the builder declared, or what RERA Bihar records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Bihar, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
359 residential projects still under way within 25 km. Step out ring by ring:
Of the 314 projects the radar draws within 6 km — every kind, every stage — 61 are residential projects still under way. This list keeps only those, and looks further out.
12 projects between 1 and 3 km — showing the nearest 6.