Project name
TRINITY GREEN ARK
Units
23 units
Mix
19 × 3BHK · 4 × 2BHK
Booked
23 of 23 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
931 sq m
Floor area
2,815 sq m
Description
TRINITY GREEN ARK

Timeline

Project startedJun 2019
RERA registeredApr 2021
Proposed completionJun 2023
TodaySep 2026
Construction progress

85% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps etc90%
Fire Fighting Fittings and Equipment90%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc90%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

0 of 23 available
TypeArea sq mAvailable
3BHK750 of 4
3BHK750 of 4
3BHK730 of 4
3BHK580 of 3
2BHK520 of 4
3BHK780 of 4

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

TRINITY ARCADE PVT LTD

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
7Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
306 homeson the public record across 7 projects
56,980 sq mbuilt-up filed
12,194 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Kochi Muncipal Municipal CorporationMunicipal Corporationthis project2 of 7 projects
Kochi Municipal CorporationMunicipal Corporation2 of 7 projects
Thrikkakara MunicipalityMunicipality2 of 7 projects
Cochin Vyttila Municipal CorporationMunicipal Corporation1 of 7 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from TRINITY ARCADE PVT LTD— the full portfolio →

03

Location

K-RERA · Registration filing
Street
Amity Lane
Village
EDAPPALLY SOUTH
Taluk
Kanayannur
District
Ernakulam
Pincode
682019
Survey no.
survey no 88/7C-5 and 88/7C-6
Patta no.
Thandapeer no 36603 and 36604
What’s nearby
SchoolsNearest school 1.2km away · College or university 126m away · Library 1.2km away
HealthcareHospital 665m away · 2 clinics within 1km · Pharmacy within 500m
LifestylePark 1.7km away · Gym or sports centre 1.8km away · 20+ restaurants and cafes within 1km
ShoppingSupermarket 684m away · Mall 1.4km away · Bank 694m away
Getting around
Expressway 157 mPrimary road 649 m · Civil Line RoadRailway line 2.1 kmMetro station 1.2km away (Palarivattom)4 bus stops within 500m
Water & environment
Canal 1.3 km · ChithrapuzhaWater body 1.3 km · Kottenkaavu Temple PondRiver 2.0 km
distances only — not a flood assessment
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹17,659per sq yd
₹21,120per sq m
Which rate
Residential Plot with Corp./Mun./Panch. road access
Matched to
The value published for this project's own survey number, in “Edappally South”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Kochi Muncipal Municipal Corporation

Municipal Corporation
approved 4 Oct 2018 · 7 yrs ago
Building Permit no. EYP2/164/COC/EYP/0506/18Survey no. survey no 88/7C-5 and 88/7C-6

The promised possession date (30 Jun 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan EYP2/164/COC/EYP/0506/18 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Kochi Muncipal Municipal Corporation

Municipal corporation / municipality

Has approved 9 RERA projects0.6% of Kerala.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
7
On record
463 flats · 0 plots
Since
2021

More apartment-heavy than Kerala overall — 100% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by K-RERA

07

Other projects nearby

The register · within 25 km

189 residential projects still under way within 25 km. Step out ring by ring:

Of the 278 projects the radar draws within 6 km — every kind, every stage — 113 are residential projects still under way. This list keeps only those, and looks further out.

3 projects within 1 km — showing the nearest 3.

EDAPPALLY SOUTHResidential (Apartment)

SKYLINE THE ONE

M/s Skyline Builders

Nov 2021registered
Nov 2026target completion
Government Guidance Rate₹17,659/sq ydScale26 flatsAuthorityK-RERA
EDAPPALLY SOUTHResidential (Apartment)

Galaxy Swiss Royale

Galaxy Homes Pvt Ltd

May 2024registered
Dec 2026target completion
Government Guidance Rate₹35,318/sq ydScale44 flatsAuthorityK-RERA
EDAPPALLY SOUTHResidential (Apartment)

PB ZAIRE

PB HOMES PVT LTD

Aug 2024registered
Jul 2029target completion
Government Guidance Rate₹17,659/sq ydScale48 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.