HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
30 units
Mix
15 × 2BHK · 15 × 3BHK
Buildings
1
Land area
1,654 sq m
Floor area
6,298 sq m
Description
BEVERLY RIVANTA

Timeline

Project startedJan 2025
RERA registeredAug 2025
Proposed completionDec 2029
TodayJul 2026
Construction progress

8% overall, as filed

Slabs of Super Structure0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation60%
Basement(s) and Plinth60%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

30 of 30 available
TypeArea sq mAvailable
2BHK835 of 5
2BHK855 of 5
2BHK864 of 4
2BHK621 of 1
3BHK1045 of 5
3BHK1125 of 5
3BHK1101 of 1
3BHK1144 of 4

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

BEVERLY DEVELOPERS

PartnershipPromoter type
Thrissur, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Chungam Keralavarma College Road
Village
AYYANTHOLE
Taluk
Thrissur
District
Thrissur
Pincode
680002
Survey no.
844/1, 844/1, 844/1, 844/1, 844/1
Patta no.
769/1184,769/11, 769/118, 769/118A, 769/118B
What’s nearby
Schools2 schools within 1km · 4 educational institutions within 1km · Library 586m away
HealthcareHospital 459m away · 1 clinic within 1km · Pharmacy within 500m
LifestylePark 625m away · Playground within 500m · Gym or sports centre 353m away
ShoppingSupermarket 458m away · Mall 254m away · Convenience store within 1km
Getting around
Primary road 389 m · Thrissur - Kanjani - Vadanappally RoadRailway line 1.2 kmRailway station 1.6km away (Thrissur)2 bus stops within 500m
Water & environment
Water body 211 m · Parakulam
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Thrissur Municipal Corporation

Municipal Corporation
approved 10 Dec 2024 · 1 yr ago
Building Permit no. DW5/BA/477/15-16Survey no. 844/1, 844/1, 844/1, 844/1, 844/1
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan DW5/BA/477/15-16 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Thrissur Municipal Corporation

Municipal corporation / municipality

Has approved 91 RERA projectsabout 1 in 17 in Kerala.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
51
On record
5,515 flats · 15 plots
Since
2021

More apartment-heavy than Kerala overall — 99% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.