Alfa- breeze

T1/OL/121/2022 · K-RERA · https://gethorizon.in/projects/alfa-breeze-chembukavu-thrissur-8gspnfp7

01

Complete project overview

K-RERA · Registration filing
Project name
Alfa- breeze
Units
15 units
Mix
15 × 2BHK
Booked
30 of 15 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
607 sq m
Floor area
1,931 sq m
Description
Alfa- breeze

Timeline

Project startedApr 2018
Proposed completionDec 2019
RERA registeredNov 2022
TodaySep 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

0 of 15 available
TypeArea sq mAvailable
2BHK600 of 15

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

Scott John

Thrissur, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Cr iyunni road
Village
CHEMBUKAVU
Taluk
Thrissur
District
Thrissur
Pincode
680020
Survey no.
405/2-18, 405/2-17
Patta no.
5886
What’s nearby
Schools1 school within 500m · 8 educational institutions within 1km · College or university 286m away
HealthcareHospital 299m away · 5 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 828m away · 49+ restaurants and cafes within 1km
ShoppingSupermarket 384m away · Mall 373m away · Convenience store within 500m
Getting around
Expressway 4.1 km · NH-Service-RoadPrimary road 451 m · Cheroor RoadRailway line 1.4 kmRailway station 1.5km away (Punkunnam)4 bus stops within 500m
Water & environment
Water body 287 m · Keeramkulangara Back Pond
distances only — not a flood assessment
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹21,809per sq yd
₹26,083per sq m
Which rate
Residential Plot with private road access
Matched to
The value published for this project's own survey number, in “Chembukkavu”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Thrissur Municipal Corporation

Municipal Corporation
approved 1 Sep 2018 · 8 yrs ago
Building Permit no. DW4-BA(57995)/2019Survey no. 405/2-18, 405/2-17

The promised possession date (31 Dec 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan DW4-BA(57995)/2019 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Thrissur Municipal Corporation

Municipal corporation / municipality

Has approved 91 RERA projectsabout 1 in 17 in Kerala.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
51
On record
5,515 flats · 15 plots
Since
2021

More apartment-heavy than Kerala overall — 99% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by K-RERA

07

Other projects nearby

The register · within 25 km

78 residential projects still under way within 25 km. Step out ring by ring:

Of the 126 projects the radar draws within 6 km — every kind, every stage — 58 are residential projects still under way. This list keeps only those, and looks further out.

10 projects within 1 km — showing the nearest 6.

CHEMBUKAVUResidential (Apartment)

FORUS LAVENDER

FORUS INITIATIVES

Mar 2024registered
Apr 2028target completion
Government Guidance Rate₹21,809/sq ydScale42 flatsAuthorityK-RERA
CHEMBUKAVUResidential (Apartment)

DOWNTOWN BY VARMA

VARMA HOMES PRIVATE LIMITED

Jun 2024registered
Sep 2029target completion
Government Guidance Rate₹21,809/sq ydScale39 flatsAuthorityK-RERA
CHEMBUKAVUResidential (Apartment)

AUREX CASCADE CITY

AUREX BUILDERS PVT LTD

Dec 2024registered
Dec 2028target completion
Government Guidance Rate₹32,713/sq ydScale45 flatsAuthorityK-RERA
CHEMBUKAVUResidential (Apartment)

PREETH APARTMENTS

THIYYADATH DEVELOPERS PRIVATE LIMITED

Oct 2025registered
Mar 2029target completion
Government Guidance Rate₹21,809/sq ydScale50 flatsAuthorityK-RERA
THRISSURResidential (Apartment)

Kairali Bansuri Apartments

Kairali Home Apartments and Villas Pvt Ltd

Nov 2023registered
Dec 2026target completion
Government Guidance Rate₹27,261/sq ydScale12 flatsAuthorityK-RERA
THRISSURResidential (Apartment)

VISHRAAM ICON

Vishraam Builders and Developers Pvt Ltd

Jul 2021registered
Jun 2026target completion
Government Guidance Rate₹54,522/sq ydScale75 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.