42 of 42 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,214 sq m
Floor area
5,381 sq m
Description
FEDERAL RESIDENCY ANNEX
Timeline
Project startedMar 2007
Proposed completionApr 2022
RERA registeredJul 2022
TodaySep 2026
Construction progress
88% overall, as filed
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
0 of 42 available
TypeArea sq mAvailable
3BHK930 of 11
2BHK910 of 10
3BHK900 of 11
3BHK870 of 10
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.
Complete project overview — done
02
Builder’s track record
K-RERA · Builder registration
Kamakshy Constrcutions
PartnershipPromoter type
Thrissur, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.6 km · Salem - Kochi - Kanyakumari HighwayPrimary road 301 mRailway line 1.9 kmRailway station 1.9km away (Thrissur)7 bus stops within 500m
Water & environment
Water body 167 m · Trippakulam PondCanal 809 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Kerala Registration Department — fair value
In Kerala it’s called the fair value.
₹10,087per sq yd
₹12,063per sq m
Which rate
Residential Plot without vehicular access
Matched to
The value published for this project's own survey number, in “Chiyyaram”.
What this number is — and isn’t
The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
K-RERA · Approved building plan
Trissur Municipal Corporation
Municipal Corporation
approved 11 May 2006 · 20 yrs ago
Building Permit no. DW3/PW7/BA/12/2006-2007Survey no. 51/1
The promised possession date (30 Apr 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan DW3/PW7/BA/12/2006-2007 on the approving authority’s portal to confirm the approval.
The approving body, at scale
Municipal Corporation / Municipality
A city corporation or municipality that approves building & development permits within its own limits. It has approved 871 RERA projects across 12 districts — about 1 in 2 in Kerala.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
K-RERA · public record
Complaints register
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
Cases listed on K-RERA's project page
Listed on K-RERA's project page
6 complaints · 1 disposed · 4 open · 1 with no clear status
Number
Forum
Date
Status
125/2024
K-RERA Authority
2024
Hearingopen
72/2023
K-RERA Authority
2023
Hearingopen
73/2023
K-RERA Authority
2023
Hearingopen
74/2023
K-RERA Authority
2023
Hearingopen
9
RERA
2020
Main case disposed IA Pending
Show 1 more
Number
Forum
Date
Status
9/2020
K-RERA Authority
2020
not stated
What the builder declared
Declared to K-RERA
Litigation
A litigation is declared on record — verify directly with K-RERAworth checking
The builder's own declaration at registration — not a court's or K-RERA's finding. A flagged line is worth checking with K-RERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
78 residential projects still under way within 25 km. Step out ring by ring:
Of the 125 projects the radar draws within 6 km — every kind, every stage — 60 are residential projects still under way. This list keeps only those, and looks further out.
4 projects within 1 km — showing the nearest 4.
CHEMBUKAVUResidential (Apartment)
JOYALUKKAS GOLD TOWER,THRISSUR
MASAAKI DEVELOPERS PRIVATE LIMITED
4 yr 3 mo
Mar 2026registered
Jun 2030target completion
Government Guidance Rate₹19,083/sq ydScale131 flatsAuthorityK-RERA
The approving body's other projects: counted by Horizon across the register.
06Complaints & litigation
Cases listed on K-RERA's project page: listed on the project's K-RERA page.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/federal-residency-annex-chiyyaram-thrissur-lrykmewb.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.