HORIZON
Share

Reigate Bluemont Park

T1/OL/011/2024 · K-RERA · https://gethorizon.in/projects/reigate-bluemont-park-chevayur-kozhikode-tgeqf7e9

01

Complete project overview

K-RERA · Registration filing
Project name
Reigate Bluemont Park
Units
14 units
Mix
10 × 2BHK · 4 × 3BHK
Booked
13 of 14 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
758 sq m
Floor area
1,948 sq m
Description
Reigate Bluemont Park

Timeline

Project startedDec 2023
RERA registeredFeb 2024
Proposed completionDec 2026
TodaySep 2026
Construction progress

54% overall, as filed

Stilt Floor0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc15%
Installation of lifts, water pumps etc40%
Sanitary Fittings50%
Electrical Fittings50%
Fire Fighting Fittings and Equipment50%
Completion of terraces floor each building60%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings65%
Overhead and Underground Water Tanks.65%
Staircases, Lifts Wells85%
The external plumbing and external plastering90%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

1 of 14 available
TypeArea sq mAvailable
2BHK690 of 5
3BHK841 of 4
2BHK700 of 5

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

REIGATE BUILDERS PRIVATE LIMITED

CompanyPromoter type
Kozhikode, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
5Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
265 homeson the public record across 5 projects
36,164 sq mbuilt-up filed
8,447 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Kozhikode Municipal CorporationMunicipal Corporationthis project4 of 5 projects
Municipal Corporation KozhikodeLocal body (LSGI)1 of 5 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from REIGATE BUILDERS PRIVATE LIMITED— the full portfolio →

03

Location

K-RERA · Registration filing
Street
Chevarambalam
Village
CHEVAYUR
Taluk
Kozhikode
District
Kozhikode
Pincode
673017
Survey no.
62/2,62/78,62/96,62/97,62/98,62/99
Patta no.
21460
What’s nearby
Schools2 schools within 500m · 5 educational institutions within 1km · College or university 1.0km away
HealthcareHospital 144m away · 1 clinic within 1km · Pharmacy within 1km
LifestylePark 1.1km away · 7 restaurants and cafes within 1km
ShoppingSupermarket 471m away · Mall 1.2km away · Convenience store within 1km
Getting around
Expressway 1.2 km · Kannur-Calicut-Valanchery HighwayPrimary road 1.1 km · Mayanad Bypass RoadNo metro or railway within 5km5 bus stops within 500m
Water & environment
Water body 616 m
distances only — not a flood assessment
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹1,722per sq yd
₹2,059per sq m
Which rate
Residential Plot with private road access
Matched to
The value published for this project's own survey number, in “Chevayur”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Kozhikode Municipal Corporation

Municipal Corporation
approved 21 Dec 2023 · 2 yrs ago
Building Permit no. TP3/55454/23Survey no. 62/2,62/78,62/96,62/97,62/98,62/99
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan TP3/55454/23 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Kozhikode Municipal Corporation

Municipal corporation / municipality

Has approved 57 RERA projects3.7% of Kerala.

an apartments market96% apartments · 4% plotted layouts. Apartments like yours are this body's core business.

Builders
36
On record
3,822 flats · 80 plots
Since
2021

More apartment-heavy than Kerala overall — 96% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by K-RERA

07

Other projects nearby

The register · within 25 km

62 residential projects still under way within 25 km. Step out ring by ring:

Of the 98 projects the radar draws within 6 km — every kind, every stage — 46 are residential projects still under way. This list keeps only those, and looks further out.

5 projects within 1 km — showing the nearest 5.

10 m awayResidential (Apartment)

PROMINENCE

PRIMESPACE PROJECTS PVT LTD · CHEVAYUR

Jul 2022registered
Dec 2026target completion
Government Guidance Rate₹3,642/sq ydScale74 flatsAuthorityK-RERA
320 m awayResidential (Apartment)

ASSET ELAN CASA

ASSET HOMES PRIVATE LIMITED · CHEVAYUR

Mar 2023registered
May 2027target completion
Government Guidance Rate₹3,642/sq ydScale36 flatsAuthorityK-RERA
570 m awayResidential (Apartment)

VEEGALAND SYMPHONY

VEEGALAND DEVELOPERS PRIVATE LIMITED · NELLIKODE

Feb 2023registered
Jul 2027target completion
Government Guidance Rate₹3,926/sq ydScale56 flatsAuthorityK-RERA
660 m awayResidential (Apartment)

QX HILL CREST

QX BUILDERS PRIVATE LIMITED · CHEVAYUR

May 2026registered
May 2029target completion
Government Guidance Rate₹1,656/sq ydScale22 flatsAuthorityK-RERA
900 m awayResidential (Apartment)

CYBERSPACE

PRISUNIC BUILDERS PVT LTD · NELLIKODE

Jan 2025registered
Jan 2029target completion
Government Guidance Rate₹2,094/sq ydScale41 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.