HORIZON
Share

TRINITY PROMINENCE

T1/OL/186/2023 · K-RERA · https://gethorizon.in/projects/trinity-prominence-edappally-south-ernakulam-j00v3m6p

01

Complete project overview

K-RERA · Registration filing
Project name
TRINITY PROMINENCE
Units
38 units
Mix
13 × 3BHK · 13 × 2BHK · 12 × 4BHK
Booked
9 of 38 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,395 sq m
Floor area
5,994 sq m
Description
TRINITY PROMINENCE

Timeline

RERA registeredOct 2023
Project startedNov 2023
Proposed completionDec 2028
TodaySep 2026
Construction progress

34% overall, as filed

Sanitary Fittings0%
Electrical Fittings0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings28%
The external plumbing and external plastering40%
Completion of terraces floor each building85%
Overhead and Underground Water Tanks.90%
Slabs of Super Structure100%
Staircases, Lifts Wells100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

29 of 38 available
TypeArea sq mAvailable
4BHK1068 of 12
3BHK10011 of 13
2BHK7610 of 13

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

TRINITY ARCADE PVT LTD

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
7Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
306 homeson the public record across 7 projects
56,980 sq mbuilt-up filed
12,194 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Kochi Muncipal Municipal CorporationMunicipal Corporation2 of 7 projects
Kochi Municipal CorporationMunicipal Corporationthis project2 of 7 projects
Thrikkakara MunicipalityMunicipality2 of 7 projects
Cochin Vyttila Municipal CorporationMunicipal Corporation1 of 7 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from TRINITY ARCADE PVT LTD— the full portfolio →

03

Location

K-RERA · Registration filing
Street
Thuruthelpara Para
Village
EDAPPALLY SOUTH
Taluk
Kanayannur
District
Ernakulam
Pincode
682028
Survey no.
103/7-2
Patta no.
53169
What’s nearby
Schools2 schools within 500m · College or university 1.0km away
HealthcareHospital 152m away · 2 clinics within 1km · Pharmacy within 500m
LifestyleNo parks within 2km · Gym or sports centre 1.2km away · 12+ restaurants and cafes within 1km
ShoppingSupermarket 480m away · Mall 1.5km away · Bank 246m away
Getting around
Expressway 166 m · Salem - Kochi - Kanyakumari RoadPrimary road 291 m · Palarivattom - Kakkanad RoadRailway line 3.2 kmMetro station 1.0km away (Palarivattom)8 bus stops within 500m
Water & environment
Canal 307 m · ChithrapuzhaWater body 1.1 km
distances only — not a flood assessment
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹17,659per sq yd
₹21,120per sq m
Which rate
Residential Plot with Corp./Mun./Panch. road access
Matched to
The value published for this project's own survey number, in “Edappally South”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Kochi Municipal Corporation

Municipal Corporation
approved 11 Nov 2025 · 10 mo ago
Building Permit no. EYP1/93/COC/EYP/1436/15(K-3745510-2025)Survey no. 103/7-2
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan EYP1/93/COC/EYP/1436/15(K-3745510-2025) on the approving authority’s portal to confirm the approval.

The approving body, at scale

Kochi Municipal Corporation

Municipal corporation / municipality

Has approved 92 RERA projectsabout 1 in 17 in Kerala.

an apartments market97% apartments · 3% plotted layouts. Apartments like yours are this body's core business.

Builders
50
On record
4,090 flats · 12 plots
Since
2021

More apartment-heavy than Kerala overall — 97% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by K-RERA

07

Other projects nearby

The register · within 25 km

188 residential projects still under way within 25 km. Step out ring by ring:

Of the 275 projects the radar draws within 6 km — every kind, every stage — 109 are residential projects still under way. This list keeps only those, and looks further out.

5 projects within 1 km — showing the nearest 5.

10 m awayResidential (Apartment)

NJN MERITON

NJN HOMES & HOUSING PROJECTS · EDAPPALLY SOUTH

Jul 2022registered
Mar 2027target completion
Government Guidance Rate₹17,659/sq ydScale12 flatsAuthorityK-RERA
10 m awayResidential (Apartment)

VARMA FICUS

VARMA HOMES PRIVATE LIMITED · EDAPPALLY SOUTH

Apr 2023registered
Jun 2028target completion
Government Guidance Rate₹35,318/sq ydScale33 flatsAuthorityK-RERA
10 m awayResidential (Apartment)

CONFIDENT SUNFLOWER

Confident Projects Residential · EDAPPALLY SOUTH

May 2023registered
Jun 2028target completion
Government Guidance Rate₹17,659/sq ydScale63 flatsAuthorityK-RERA
970 m awayResidential (Apartment)

SKYLINE THE ONE

M/s Skyline Builders · EDAPPALLY SOUTH

Nov 2021registered
Nov 2026target completion
Government Guidance Rate₹17,659/sq ydScale26 flatsAuthorityK-RERA
990 m awayResidential (Apartment)

SMS MAPLE

SMS BUILDERS · EDAPPALLY SOUTH

Dec 2023registered
May 2028target completion
Government Guidance Rate₹5,518/sq ydScale20 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.