From the builder's latest quarterly progress report filed with RERA Karnataka — % complete overall and by stage, as of that filing. A dated snapshot, not a live tracker.
Find your flat
Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.
UnitTypeCarpet sq mExclusive area sq mUndivided share sq m
F-1011st Floor2 BHK54.405.5927.88
F-1021st Floor2 BHK50.335.2321.19
F-1031st Floor2 BHK78.8811.9722.31
S-2012nd Floor2 BHK55.375.5928.06
S-2022nd Floor2 BHK51.025.2321.19
S-2032nd Floor1 BHK28.252.7611.15
S-2042nd Floor2 BHK49.976.4422.31
TH-3013rd Floor2 BHK57.896.5727.88
TH-3023rd Floor2 BHK50.764.9921.19
TH-3033rd Floor3 BHK8315.4034.57
FO-4014th Floor2 BHK57.896.5729.04
FO-4024th Floor2 BHK50.764.9922.07
FO-4034th Floor3 BHK8315.4036.01
FF-5015th Floor1 BHK55.367.8829.04
FF-5025th Floor2 BHK48.114.9922.07
FF-5035th Floor1 BHK42.642.1136.01
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes. Exclusive area is the common area allotted exclusively to the unit's owner, as the register names it. Undivided share is the portion of the land that comes with the unit, as filed — a share of the whole plot, not a demarcated piece of ground.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
RERA Karnataka · Registration filing
Taluk
Belagavi
District
Belagavi
Pincode
590006
Address
CTS NO. 4105, CORRESPONDING TO PLOT NO. 397, OUT OF R S NO. 32 HISSA NO. 2/25 , FIRST CORSS, BHAGYA NAGAR , Belagavi , Belagavi, Karnataka - 590006
North boundary
PROPERTY OF ANAND BARGE i.e. CTS NO. 4104
East boundary
SERVICE ROAD
South boundary
PROPERTY OF GHORPADE i.e. CTS NO. 4106
West boundary
50 FEET MAIN ROAD
What’s nearby
Schools2 schools within 1km · 7 educational institutions within 1km · College or university 438m away
HealthcareHospital 241m away · 4 clinics within 1km · Doctor's clinic within 1km
LifestylePark 1.5km away · 5 restaurants and cafes within 1km
ShoppingSupermarket 638m away · Mall 1.5km away · Convenience store within 1km
Getting around
Expressway 494 m · Congress RoadPrimary road 461 mRailway line 526 mRailway station 2.6km away (Belagavi)Bus stop within 500m
Water & environment
Water body 1.2 km
distances only — not a flood assessment
Land, title & encumbrance
LandOwned by the promoter
ConversionOne or more surveys not converted to non-agricultural
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price
₹5.43 Cr declared to build 16 flats. What that works out to:
₹33.91 Lakhdeclared cost per flatall-in — land + construction
₹3,229/sq ftof built-up area₹34,761/sq m
26%of the cost is land₹3,137/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Karnataka registration department
In Karnataka it’s called the guidance value.
No government guidance rate is shown for this project.
Karnataka's guidance-value gazettes are in Horizon's record, but this project's address doesn't name a place any of its sub-registrar's tables print.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RERA Karnataka · Approved building plan
Commissioner, City Corporation, Belagavi
Municipal / Corporation
approved 1 Feb 2025 · 1 yr ago
Building Permit no. BGM-LBPAS-26974/24-25/BPSurvey no. 4105
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan BGM-LBPAS-26974/24-25/BP on the approving authority’s portal to confirm the approval.
The approving body, at scale
Commissioner, City Corporation, Belagavi
Municipal Corporation
Has approved 206 RERA projects — 2.4% of Karnataka.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
189
On record
2,495 flats · 0 plots
Reach
2 taluks
Since
2017
More apartment-heavy than Karnataka overall — 100% apartments here vs 62% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with RERA Karnataka against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to RERA Karnataka
Litigation
Declared free of litigation
The builder's own declaration at registration — not a court's or RERA Karnataka's finding. A flagged line is worth checking with RERA Karnataka.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Karnataka, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
106 residential projects still under way within 25 km. Step out ring by ring:
Of the 253 projects the radar draws within 6 km — every kind, every stage — 80 are residential projects still under way. This list keeps only those, and looks further out.