NANMA PROPERTIES LTD
Clearway ASTRUM
Timeline
88% overall, as filed
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.




In Kerala it’s called the fair value.
What this number is — and isn’t
The promised possession date (23 Jun 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan C4-807/15 on the approving authority’s portal to confirm the approval.
A village-level local self-government (LSGI) that issues the permit — Kerala's most common approving body. It has approved 268 RERA projects across 13 districts — about 1 in 6 in Kerala.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
Only what the builder declared, or what K-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
189 residential projects still under way within 25 km. Step out ring by ring:
Of the 146 projects the radar draws within 6 km — every kind, every stage — 64 are residential projects still under way. This list keeps only those, and looks further out.
20 projects between 1 and 3 km — showing the nearest 6.
NANMA PROPERTIES LTD
VARMA HOMES PRIVATE LIMITED
Confident Projects Residential
VEEGALAND DEVELOPERS PRIVATE LIMITED
TULSI DEVELOPERS INDIA PRIVATE LIMITED
GOOD EARTH INDIA INFRA LIMITED
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.
What this record cannot tell you
Where each section of this report comes from.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/clearway-astrum-cheranallur-ernakulam-anahhjp0.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.