CAMPUS WOODS
Units
65 units
Mix
30 × 2BHK · 25 × 3BHK · 5 × 1BHK · 5 × 4BHK
Booked
10 of 65 filed sold/bookedas declared in the RERA filing
Buildings
2
Land area
2,913 sq m
Floor area
8,717 sq m
Description
CAMPUS WOODS

Timeline

Project startedFeb 2015
RERA registeredJul 2022
Proposed completionSep 2022
TodaySep 2026
Construction progress

50% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings0%
Electrical Fittings0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Overhead and Underground Water Tanks.20%
Installation of lifts, water pumps etc30%
Sanitary Fittings50%
Completion of terraces floor each building50%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings50%
Staircases, Lifts Wells50%
Staircases, Lifts Wells70%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc70%
Electrical Fittings80%
The external plumbing and external plastering80%
Fire Fighting Fittings and Equipment80%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings85%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Overhead and Underground Water Tanks.100%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

55 of 65 available
TypeArea sq mAvailable
2BHK4943 of 5
3BHK2,22712 of 20
1BHK2325 of 5
3BHK4625 of 5
4BHK8655 of 5
2BHK1,78525 of 25

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

NEST Realties India Private Limited

CompanyPromoter type
Ernakulam, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
4Projects
1Cities
2021–2023Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
424 homeson the public record across 4 projects
63,219 sq mbuilt-up filed
21,615 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Keezhmad Grama PanchayatGrama Panchayat2 of 4 projects
Municipal Council KalamasseryLocal body (LSGI)this project1 of 4 projects
Vijayapuram PanchayathLocal body (LSGI)1 of 4 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from NEST Realties India Private Limited— the full portfolio →

03

Location

K-RERA · Registration filing
Street
COCHIN UNIVERSITY
Village
KANAYANNUR
Taluk
Kanayannur
District
Ernakulam
Pincode
682035
Survey no.
657/13,666/11
Patta no.
35751,36341
What’s nearby
Schools1 school within 500m · 3 educational institutions within 1km · College or university 236m away
HealthcareHospital 517m away · 1 clinic within 1km
LifestylePark 1.7km away · Gym or sports centre 610m away · 6 restaurants and cafes within 1km
ShoppingSupermarket 536m away · ATM within 500m
Getting around
Expressway 1.1 kmPrimary road 1.0 km · Seaport Airport RoadRailway line 1.4 kmMetro station 1.1km away (Cochin University)2 bus stops within 500m
Water & environment
Water body 138 m · CUSAT Pond
distances only — not a flood assessment
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹2,944per sq yd
₹3,521per sq m
Which rate
Residential Plot with Corp./Mun./Panch. road access
Matched to
The rate published for the village of “Kanayannur”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Municipal Council Kalamassery

Local body (LSGI)
approved 1 Feb 2015 · 11 yrs ago
Building Permit no. BASurvey no. 657/13,666/11

The promised possession date (30 Sep 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan BA on the approving authority’s portal to confirm the approval.

The approving body, at scale

The local self-government (LSGI)

The local body that approved this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

189 residential projects still under way within 25 km. Step out ring by ring:

Of the 213 projects the radar draws within 6 km — every kind, every stage — 91 are residential projects still under way. This list keeps only those, and looks further out.

38 projects between 1 and 3 km — showing the nearest 6.

THRIKKAKARA NORTHResidential (Apartment)

MELONWOOD MANERA

Melonwood Homes Private Limited

Apr 2021registered
May 2026target completion
Government Guidance Rate₹12,361/sq ydScale24 flatsAuthorityK-RERA
THRIKKAKARA NORTHResidential (Apartment)

JEWEL PRISTINE GREENS

JEWEL HOMES PVT LTD

Jun 2021registered
Jul 2026target completion
Government Guidance Rate₹7,726/sq ydScale73 flatsAuthorityK-RERA
THRIKKAKARA NORTHMixed (Commercial & Residential)

CASADEL TOWNCASTLE

CASADEL BUILDERS INDIA PRIVATE LIMITED

Aug 2023registered
Dec 2027target completion
Government Guidance Rate₹13,906/sq ydScale49 flatsAuthorityK-RERA
THRIKKAKARA NORTHMixed (Commercial & Residential)

Beyond Infinity

CASADEL PROPERTIES PRIVATE LIMITED

Jul 2025registered
Dec 2030target completion
Government Guidance Rate₹13,906/sq ydScale35 flatsAuthorityK-RERA
THRIKKAKARA NORTHResidential (Apartment)

CLASSIC INDIAN EARTH

Classic Constructions

Feb 2025registered
Dec 2029target completion
Government Guidance Rate₹7,726/sq ydScale32 flatsAuthorityK-RERA
THRIKKAKARA NORTHResidential (Apartment)

NATIONAL ROYAL PALACE

NATIONAL BUILDERS

Dec 2025registered
Dec 2028target completion
Government Guidance Rate₹6,622/sq ydScale83 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.