HORIZON
Share

Sobha Brooklyn Towers - Town Park Phase 2, W2

PRM/KA/RERA/1251/308/PR/210122/004648 · RERA Karnataka · https://gethorizon.in/projects/sobha-brooklyn-towers-town-park-phase-2-anekal-vk14zsl7

01

Complete project overview

RERA Karnataka · Registration filing
Units
261 units
Unit mix
261 × Flats
Towers
1
Floors
36
Land area
5,977 sq m
Built-up area
16,129 sq m
FAR sanctioned
2.7458
Covered area
1,959 sq m
Open area
4,018 sq m
Land parcels
5 survey nos

Timeline

Project startedDec 2021
RERA registeredJan 2022
Proposed completionDec 2027
TodaySep 2026
Construction progress

72% overall, as filed

Amenities0%
Internal infra9%
External infra9%
Finishing26%
Sub-structure60%
Super-structure83%
Common areas100%
From the builder's latest quarterly progress report filed with RERA Karnataka — % complete overall and by stage, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.

UnitTypeCarpet sq mExclusive area sq mUndivided share sq m
20414th Floor4 BHK145.0778.0956.68
20424th Floor2 BHK92.4948.8035.89
20434th Floor3 BHK114.8658.3944.01
20515th Floor4 BHK145.0778.0956.68
20525th Floor3 BHK114.8658.3944.01
20535th Floor3 BHK114.8658.3944.01
20616th Floor4 BHK145.0778.0956.68
20626th Floor3 BHK114.8658.3944.01
20636th Floor3 BHK114.8658.3944.01
20717th Floor4 BHK145.0778.0956.68
20727th Floor3 BHK114.8658.3944.01
20737th Floor3 BHK114.8658.3944.01
20818th Floor4 BHK145.0778.0956.68
20828th Floor3 BHK114.8658.3944.01
20838th Floor3 BHK114.8658.3944.01
20919th Floor4 BHK145.0778.0956.68
20929th Floor3 BHK114.8658.3944.01
20939th Floor3 BHK114.8658.3944.01
210110th Floor4 BHK145.0778.0956.68
210210th Floor3 BHK114.8658.3944.01
210310th Floor3 BHK114.8658.3944.01
211111th Floor4 BHK145.0778.0956.68
211211th Floor3 BHK114.8658.3944.01
211311th Floor3 BHK114.8658.3944.01
212112th Floor4 BHK145.0778.0956.68
212212th Floor3 BHK114.8658.3944.01
212312th Floor3 BHK114.8658.3944.01
213113th Floor4 BHK145.0778.0956.68
213213th Floor3 BHK114.8658.3944.01
213313th Floor3 BHK114.8658.3944.01
214114th Floor4 BHK145.0778.0956.68
214214th Floor3 BHK114.8658.3944.01
214314th Floor3 BHK114.8658.3944.01
215115th Floor4 BHK145.0778.0956.68
215215th Floor3 BHK114.8658.3944.01
215315th Floor3 BHK114.8658.3944.01
216116th Floor4 BHK145.0778.0956.68
216216th Floor3 BHK114.8658.3944.01
216316th Floor3 BHK114.8658.3944.01
217117th Floor4 BHK145.0778.0956.68
217217th Floor3 BHK114.8658.3944.01
217317th Floor3 BHK114.8658.3944.01
218118th Floor4 BHK145.0778.0956.68
218218th Floor3 BHK114.8658.3944.01
218318th Floor3 BHK114.8658.3944.01
219119th Floor3 BHK123.3571.7749.56
219219th Floor3 BHK114.8658.3944.01
219319th Floor3 BHK114.8658.3944.01
220120th Floor4 BHK145.0778.0956.68
220220th Floor3 BHK114.8658.3944.01
220320th Floor3 BHK114.8658.3944.01
221121st Floor4 BHK145.0778.0956.68
221221st Floor3 BHK114.8658.3944.01
221321st Floor3 BHK114.8658.3944.01
222122nd Floor4 BHK145.0778.0956.68
222222nd Floor3 BHK114.8658.3944.01
222322nd Floor3 BHK114.8658.3944.01
223123rd Floor4 BHK145.0778.0956.68
223223rd Floor3 BHK114.8658.3944.01
223323rd Floor3 BHK114.8658.3944.01
224124th Floor4 BHK145.0778.0956.68
224224th Floor3 BHK114.8658.3944.01
224324th Floor3 BHK114.8658.3944.01
225125th Floor4 BHK145.0778.0956.68
225225th Floor3 BHK114.8658.3944.01
225325th Floor3 BHK114.8658.3944.01
226126th Floor4 BHK145.0778.0956.68
226226th Floor3 BHK114.8658.3944.01
226326th Floor3 BHK114.8658.3944.01
227127th Floor4 BHK145.0778.0956.68
227227th Floor3 BHK114.8658.3944.01
227327th Floor3 BHK114.8658.3944.01
228128th Floor4 BHK145.0778.0956.68
228228th Floor3 BHK114.8658.3944.01
228328th Floor3 BHK114.8658.3944.01
229129th Floor3 BHK123.3571.7749.56
229229th Floor3 BHK114.8658.3944.01
229329th Floor3 BHK114.8658.3944.01
230130th Floor4 BHK145.0778.0956.68
230230th Floor3 BHK114.8658.3944.01
230330th Floor3 BHK114.8658.3944.01
231131st Floor4 BHK145.0778.0956.68
231231st Floor3 BHK114.8658.3944.01
231331st Floor3 BHK114.8658.3944.01
232132nd Floor4 BHK145.0778.0956.68
232232nd Floor3 BHK114.8658.3944.01
232332nd Floor3 BHK114.8658.3944.01
233133rd Floor4 BHK145.0778.0956.68
233233rd Floor3 BHK114.8658.3944.01
233333rd Floor3 BHK114.8658.3944.01
234134th Floor4 BHK145.0778.0956.68
234234th Floor3 BHK114.8658.3944.01
234334th Floor3 BHK114.8658.3944.01
235135th Floor4 BHK145.0778.0956.68
235235th Floor3 BHK114.8658.3944.01
235335th Floor3 BHK114.8658.3944.01
236136th Floor4 BHK145.0778.0956.68
236236th Floor3 BHK114.8658.3944.01
236336th Floor3 BHK114.8658.3944.01

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes. Exclusive area is the common area allotted exclusively to the unit's owner, as the register names it. Undivided share is the portion of the land that comes with the unit, as filed — a share of the whole plot, not a demarcated piece of ground.

02

Builder’s track record

RERA Karnataka · Builder registration

SOBHA LIMITED

CompanyPromoter type
Bengaluru UrbanBased in
146Projects
12Cities
2017–presentActive
Timelineevery project, start → promised completion
Sobha IndraprasthaSobha City - Casa Paradiso Block 4Sobha Silicon Oasis Phase 1 Wing 1, 2, 3, 4, 5 & 6Sobha Dream Acres - Rain forest Phase 15 Wing 17Sobha Silicon Oasis Phase 6 Block 2 and 3 (Row house No. 1 to 8 & 11 to 17)Sobha Silicon Oasis Phase 7 Block 2 and 3 (Row House No. 9, 10)Sobha Arena - The Park ( Block 2 )Sobha Arena - The Plaza (Block 3)Sobha Silicon Oasis Phase 2 Wing 7Sobha Valley View - HeritageSobha Silicon Oasis Phase 3 Wing 8Sobha Dream Acres - Rain Forest Phase 5 Wing 16Sobha AvenueSobha ClovellySobha Dream Acres - Tropical Greens Phase 8 Wing 43 and 44Sobha Dream Acres - Tropical Greens Phase 7 Wing 42Sobha Dream Acres - Tropical Greens Phase 6 Wing 41Sobha Silicon Oasis Phase 5 Wing 10 & 11Sobha Dream Acres - Rain Forest Phase 2 Wing 3 and 4Sobha Silicon Oasis Phase 4 Wing 9Sobha Dream Acres - Tropical Greens Phase 9 Wing 45Sobha Bela Encosta Phase-1Marina One Phase - 4Marina One Phase-5Marina One Phase-1Marina One Phase 2Marina One Phase 3Sobha Dream Acres - Rain forest Phase 1 Wing 1 and 2Sobha Palm CourtSobha Dream Acres - Palm Springs Phase 13 Wing 52Sobha Morzaria Grandeur 2 (W1)Sobha Dream Acres - Rain Forest Phase 4 Wing 11Sobha Dream Acres - Palm Springs Phase 11 Wing 47Sobha Atlantis Phase 1 block 3 and 4Sobha Atlantis Phase 2 block 1 and 2Sobha Dream Acres - Tropical Greens Phase 10 Wing 46Sobha 25 RichmondSobha Dream Acres - Palm Springs Phase 12 Wing 48 and 49Sobha Dream Acres - Rain Forest Phase 3 Wing 5 and 6Sobha Dream Acres - Palm Springs Phase 14 Wing 53Sobha Dream Acres - Palm Springs Phase 17 Wing 54Sobha Dream Acres - Tropical Greens Phase 18 Wing 39 and 40Sobha HRC Pristine Phase 4 Block 4 and 5Sobha - HRC Pristine Phase 3 Block 3Sobha HRC Pristine Phase 2 Block 2Sobha HRC Pristine Phase 1 Block 1Sobha Arena - Pebble Court (Block 1)Sobha Arena - The Square (Block 4)Sobha Forest EdgeSobha Dream Acres - Tropical Greens Phase 19 Wings 19 and 20Sobha MeadowsSobha Dream Acres - Tropical Greens Phase 20 Wing 18Sobha Lake Gardens Phase 1Sobha Lake Gardens Phase 2Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 and 24Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 and 22Sobha Dream Acres - Tropical Greens Phase 23 Wing 25, 26, 27 and 28Sobha Dream Acres - Tropical Greens Phase 24 Wing 29 and 30Sobha Dream Acres - Tropical Greens Phase 25 Wing 32, 33 and 34Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38Sobha Dream Gardens Phase 2 – Wing 5, 6 and 7Sobha Dream Gardens Phase 1 – Wing 8 and 9Sobha Dream Gardens Phase 3 – Wing 3 and 4Sobha Dream Gardens Phase 4 – Wing 1 and 2Sobha Dream Gardens Phase 5 – Wing 10Sobha RajvilasSobha Royal Pavilion Phase 1 - Wing 6 and 7Sobha Royal Pavilion Phase 8 - Wing 15Sobha Royal Pavilion Phase 2 - Wing 4 and 5Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3Sobha Royal Pavilion Phase 6 - Wing 10 and 11Sobha Royal Pavilion Phase 5 - Wing 8 and 9Sobha Royal Pavilion Phase 3 - Wing 16Sobha Dream Acres - Palm Springs Phase 16 Wing 50SOBHA NESARA BLOCK-2SOBHA NESARA BLOCK-1SOBHA NESARA BLOCK-3Sobha Dream HeightsSobha PalaciaSobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58Sobha City AthenaSobha Windsor Phase 2 Wing 3, 4 and 5Sobha Windsor Phase 3 Wing 6, 7 and 8Sobha Windsor Phase 4 Wing 9, 10 and 11Sobha Windsor Phase 1 Wing 1 and 2Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2SOBHA AVALONSobha Brooklyn Towers - Town Park Phase 2, W2Sobha Brooklyn Towers - Town Park Phase 5, W3Sobha Royal CrestSOBHA WATER FRONTSOBHA MEADOWS WHISPERING HILLSobha Sentosa Phase 1 Wing 7Sobha Sentosa Phase 2 Wing 5 and 6Sobha Sentosa Phase 3 Wing 3 and 4Sobha Sentosa Phase 4 Wing 1 and 2Sobha Victoria park phase 1Sobha Victoria Park Phase 2Sobha InsigniaSobha Dream Gardens Phase 3 - Wing 3 and 4Sobha GaleraSobha Brooklyn Towers - Town Park Phase 1, W1Sobha Westhill Phase-I, II & IIISobha Neopolis Phase 1 - W 14, 15, 16, 17, 18 &19Sobha Neopolis Phase 3 - W 1, 2, 10 & 11Sobha Oakshire Phase 1 Wing 1,2,7 and 8Sobha Oakshire Phase 2 Wing 3,4,9 and 10Sobha Oakshire Phase 3 Wing 5,6,11 and 12Sobha Dream Gardens Phase 5 - Wing 10Sobha Dream Gardens Phase 4 - Wing 1 and 2Sobha Neopolis Phase 2 - W 12 & 13SOBHA ELYSIASobha Neopolis Phase 5 - W 5, 6 & 7Sobha Neopolis Phase 4 - 3, 4, 8 & 9SOBHA RIDGE WHISPERING HILLSOBHA Crystal Meadows Phase 1 Wing 1 to 6SOBHA Crystal Meadows Phase 2 Wing 7 and 8SOBHA Crystal Meadows Phase 3 Wing 9 to 15SOBHA Crystal Meadows Phase 4 Wing 23 to 28SOBHA Crystal Meadows Phase 5 Wing 16 to 22Sobha Brooklyn Towers - Town Park Phase 4, W4Sobha Brooklyn Towers - Town Park Phase 3, W5Sobha Infinia Phase 2A Block 5 Wing 5Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2Sobha AurumSobha Hamptons -Townpark Phase 1 W4 to 6Sobha Madison Heights-Townpark Phase 1 W5 to 7SOBHA Ayana at Dream Acres Wing 60 to 71SOBHA MAGNUSSOBHA InizioSOBHA WOODS WHISPERING HILLSOBHA ALTAIRSobha Madison Heights-Townpark Phase 2 W1 to 4ONE RESIDENCES AT SOBHA ONE WORLD Ph1 W1 and 2ONE RESIDENCES AT SOBHA ONE WORLD Ph6 W12,13,14SOBHA BOULEVARDONE RESIDENCES AT SOBHA ONE WORLD Ph2 W3 and 4ONE RESIDENCES AT SOBHA ONE WORLD Ph5 W9,10,11ONE RESIDENCES AT SOBHA ONE WORLD Ph3 W5 and 6ONE RESIDENCES AT SOBHA ONE WORLD Ph4 W7 and 8Sobha Hamptons -Townpark Phase 2 W1 to 3
Builder DNAthe whole portfolio, summed
16,609 homes · 253 plotson the public record across 146 projects
33,89,642 sq mbuilt-up filed
63,289 sq mplotted area
21,28,951 sq mland declared
₹32865.76 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
BBMP - Bruhat Bengaluru Mahanagara PalikeMunicipal / Corporation80 of 144 projects
BDA - Bangalore Development AuthorityUrban Development Authority17 of 144 projects
BMRDA - Bangalore Metropolitan Region Development AuthorityUrban Development Authoritythis project7 of 144 projects
Satellite Town Ring Road Planning AuthorityTown & Country Planning (DTCP)6 of 144 projects
Kochi Municipal CorporationMunicipal Corporation5 of 144 projects
Anekal Planning AuthorityTown & Country Planning (DTCP)4 of 144 projects
BIAPPA - Bangalore Airport Area Planning AuthorityUrban Development Authority3 of 144 projects
Pune Municipal CorporationMunicipal Corporation3 of 144 projects
Thiruvananthapuram Municipal CorporationMunicipal Corporation3 of 144 projects
GIFT Urban Development AuthorityUrban Development Authority2 of 144 projects
Mysuru Urban Development AuthorityUrban Development Authority2 of 144 projects
Planning authority2 of 144 projects
Tripunithura MunicipalityMunicipality2 of 144 projects
Belagavi Urban Development AuthorityUrban Development Authority1 of 144 projects
CMDA (Chennai Metropolitan Development Authority)CMDA (Chennai Metropolitan Development Authority)1 of 144 projects
Local Planning AuthorityTown & Country Planning (DTCP)1 of 144 projects
Municipal CorporationMunicipal Corporation1 of 144 projects
Others1 of 144 projects
Peruvayal Grama PanchayatGrama Panchayat1 of 144 projects
Slum Rehabilitation AuthoritySlum Rehabilitation Authority1 of 144 projects
Town & Country Planning (DTCP)Town & Country Planning (DTCP)1 of 144 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from SOBHA LIMITED— the full portfolio →

03

Location & price analysis

RERA Karnataka · Registration filing
Taluk
Anekal
District
Bengaluru Urban
Pincode
562107
Address
Phase 2 in the composite project Sobha Brooklyn Towers - Town Park situated at , Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka , Anekal , Bengaluru Urban, Karnataka - 562107
North boundary
Halla and thereafter Sy No.54 and remaining portions of Sy No.52/2, 51/1 and 52/1 and land in Sy Nos.74/8 and 74/9
East boundary
Land in Sy.No.74/8, 74/9, remaining portions of Sy Nos.52/1, 51/1 & 51/2
South boundary
Road and thereafter land in Sy No.50/2 and remaining portion of land in Sy Nos.51/1 and 51/2
West boundary
Halla thereafter the Land in Sy.Nos. 155/3, 156/3, 50/1 and 156/3
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 304m away · 1 clinic within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 2.0km away · Convenience store within 1km · Bank 638m away
Getting around
Expressway 158 m · Hosur RoadPrimary road 2.9 kmRailway line 4.1 km · Bangalore-SalemRailway station 4.7km away (Heelalige)Bus stop within 1km
Water & environment
Water body 598 m
distances only — not a flood assessment
Land, title & encumbrance
LandJoint development (JDA) — built on the owner’s land by agreement
ConversionConverted to non-agricultural
MortgageNone declared on the project / land
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price

₹136.33 Cr declared to build 261 flats. What that works out to:

₹52.23 Lakhdeclared cost per flatall-in — land + construction
₹7,853/sq ftof built-up area₹84,526/sq m
29%of the cost is land₹6,089/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Karnataka registration department

In Karnataka it’s called the guidance value.

No government guidance rate is shown for this project.

Karnataka's guidance-value gazettes are in Horizon's record, but this project's address doesn't name a place any of its sub-registrar's tables print.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

RERA Karnataka · Approved building plan

BMRDA - Bangalore Metropolitan Region Development Authority

Urban Development Authority
approved 22 Oct 2021 · 4 yrs ago
Building Permit no. APA/CC/115/2021-22Survey no. 51/1
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan APA/CC/115/2021-22 on the approving authority’s portal to confirm the approval.

The approving body, at scale

BMRDA

Urban Development Authority · Bangalore Metropolitan Region Development Authority

Has approved 550 RERA projectsabout 1 in 16 in Karnataka.

a mixed market46% apartments · 54% plotted layouts.

Builders
441
On record
16,246 flats · 16,792 plots
Reach
14 taluks
Since
2017

More layout-heavy than Karnataka overall — 54% plots here vs 38% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Karnataka

07

Other projects nearby

The register · within 25 km

622 residential projects still under way within 25 km. Step out ring by ring:

Of the 167 projects the radar draws within 6 km — every kind, every stage — 48 are residential projects still under way. This list keeps only those, and looks further out.

10 projects within 1 km — showing the nearest 6.

10 m awayApartment

Sobha Brooklyn Towers - Town Park Phase 1, W1

SOBHA LIMITED · Anekal

Apr 2023started
Dec 2027target completion
Declared cost₹136.59 CrScale99 flatsAuthorityRERA Karnataka
10 m awayApartment

Sobha Brooklyn Towers - Town Park Phase 4, W4

SOBHA LIMITED · Anekal

Oct 2024started
Jun 2029target completion
Declared cost₹154.77 CrScale99 flatsAuthorityRERA Karnataka
10 m awayApartment

Sobha Brooklyn Towers - Town Park Phase 3, W5

SOBHA LIMITED · Anekal

Oct 2024started
Jun 2029target completion
Declared cost₹215.29 CrScale99 flatsAuthorityRERA Karnataka
10 m awayApartment

Sobha Brooklyn Towers - Town Park Phase 5, W3

SOBHA LIMITED · Anekal

Dec 2021started
Jun 2028target completion
Declared cost₹139.00 CrScale261 flatsAuthorityRERA Karnataka
30 m awayResidential/Group Housing

Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5

SOBHA LIMITED · Anekal

Apr 2021started
Dec 2026target completion
no escrow declaredDeclared cost₹314.29 CrAuthorityRERA Karnataka
30 m awayResidential/Group Housing

Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2

SOBHA LIMITED · Anekal

Apr 2021started
Sep 2028target completion
no escrow declaredDeclared cost₹314.29 CrAuthorityRERA Karnataka

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.